BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Site work for an educational facility in Costa Mesa, California. Completed plans call for site work for a educational facility.

This project involves the complete preparation and installation of a new irrigation system, laying fresh sod, and providing a 90-day maintenance period to ensure successful establishment. For further information, contact Jonathan Geiszler, Director, Purchasing & Warehouse, at jgeisler@nmusd.us or 714-424-5063. Online Q&A Q&A Deadline 02/12/2025 2:00 PM (PST) Liquidated Damages $750.00 per day Scope of Work This project involves the complete preparation and installation of a new irrigation system, laying fresh sod, and providing a 90-day maintenance period to ensure successful establishment. Scope includes, but is not limited to the following: 1. Site Preparation 2. Remove all existing mulch, grass, or debris from the designated area. 3. Excavate and grade the soil to create a smooth and stable foundation. 4. Level the soil as necessary to support proper sod installation. 5. Irrigation System Installation 6. Install new lateral irrigation lines and sprinkler heads. 7. Connect the new components to the existing irrigation system to maintain full functionality and proper water coverage. 8. Sod Installation 9. Submittal: provide product sheet of recommended grass type for approval prior to installation. 10. Supply and install fresh sod per the site plans and specifications. 11. Ensure the sod is laid evenly and thoroughly covers the area. 12. Finishing Touches 13. Complete all necessary tasks and incidentals to achieve high-quality, professional results. 14. 90-Day Maintenance Period 15. Provide comprehensive maintenance for 90 days after installation. 16. Ensure proper watering, monitoring, and care to promote healthy sod growth and establishment. 17. Any areas found to not in healthy condition during the maintenance period is to be removed and replaced. 18. Reference following pages for logistics plan for each site. A second walk will not be conducted. The initial site walk served as the opportunity to take any necessary measurements

Under Construction

Educational

$83,750.00

Public - City

Site Work

5

7

2

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
302
Bidding Soon
3,701
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 25, 2025

Project location map

Multiple Locations, Costa Mesa, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.