BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Site work and paving for a civil project in Sherwood, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Region 1 PE EA NA CON EA CON04823 Ice Age Drive: Oregon St - Sw Dahlke Ln (Tonquin) Section in Sherwood. Fap No. 6710(007). Estimated Value : ($ 10,000,000 - $ 20,000,000). Req. Approx. 445 Ft2 Temp. Signs; 600 Hr Flaggers; 120 Hr Bpa Safety Watcher; Seg. And Stockpile Contam. Soil; Const. Surv. Work; 52,500 Yd3 Gen. Exc.; 1,455 Yd2 Subg. Stab.; 14,900 Yd2 Subg. Geot.; 1,821 Yd3 Rock Exc.; 422 Yd3 Boulder Exc.; 750 Yd3 Trench Exc.; 7,607 Ft Mainline Video Inspect.; 2,617 Ft Sanitary Sewer Pipe; 4,450 Ft Storm Sewer Pipe; 33 Ea. Conc. Mh; 53 Ea. Conc. Inlets; 1,868 Yd2 Cold Plane Pvmt. Rem.; 13,827 Ton Aggr. Base; 4,808 Ton Acp (289 Ton Pg 64-22); 10,229 Ft Conc. Curbs; 6,076 Ft2 Reinf. Conc. Drvwys.; 72,300 Ft2 Conc. Walks; 118 Ft2 Conc. Surf.; 23 Ea. Curb Ramps; 435 Ft2 Trunc. Domes; 21 Ea. Rem. Bollards; 11,349 Ft Thermo. Striping; 20 Ea. Pvmt. Legends; 804 Ft2 Pvmt. Bar; 160 Ft2 Signs; 62 Ft Sig. Supp. Drilled Shaft; Pole Foundations; Lum., Lamps, Ballasts; Switching, Conduit, Wiring; Lighting Poles & Arms; Telecommunications Material, Install., Splicing & Testing; Traff. Sig. Install.; 3 Ea. Bioretention Pond; 8.1 Ac. Weed Control; 2.11 Ac. Seeding; 2,270 Yd3 Topsoil; 154 Ea. Trees; 166,423 Ea. Shrubs, Groundcover, Plants; 2,620 Ft Root Barrier; 9,230 Ft2 Weed Control Geot.; 1,390 Ft Cl Fence; 5 Ea. Cl Gates; Irrig. Syst.; 3,747 Ft Pot. Water Pipe; 6 Ea. Hydrants; Install Power & Comm. Utilities; 200 Ft Extra for Rigid Stl. Conduit. Completion Time: November 14, 2026. Class of Work: Earthwork and Drainage. This Project Contains Asphalt and Fuel Escalation Clauses. This Project Contains a 12% Dbe Goal The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 ORDOT - Ice Age Drive: Oregon St-SW Dahlke Ln (Tonquin) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$10,130,321.00

Public - State/Provincial

Paving, Site Work

317

10

8

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
65
Bidding Soon
940
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.