Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Site work for a water / sewer project in Sherwood, Oregon. Completed plans call for site work for a water / sewer project.
The Contractor shall submit a supplemental look ahead Project Work schedule each week to the Engineer. The look ahead Project Work schedule is supplemental to the Type A, B, or C schedule specified below. The supplemental look ahead Project Work schedule shall Identify the sequencing of activities and time required for prosecution of the Work. Provide for orderly, timely, and efficient prosecution of the Work. Contain sufficient detail to enable both the Contractor and the Engineer to plan, coordinate, analyze, document, and control their respective Contract responsibilities. Gleneagle Stormwater Treatment Facility Contract is for Public Work Subject to Boli Wage Rates. Pre-qualifications Are Required. Questions Shall Be Submitted by 5:00 Pm (Local Time) on Thursday, May 1, 2025 via Email to Craig Christesen, P.e., at Christensenc@sherwoodoregon.gov S *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$325,333.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 9, 2025
Multiple Locations, Sherwood, OR
Related To This Project
Sherwood, OR
Bid Date: May 22 2025
Sherwood, OR
Bid Date: Jun 05 2025
Sherwood, OR
Bid Date: Jun 18 2025
Sherwood, OR
Bid Date: Mar 11 2021
Sherwood, OR
Bid Date: Aug 14 2025
Sherwood, OR
Bid Date: Sep 04 2025
Sherwood, OR
Bid Date: Jan 22 2026
Sherwood, OR
Bid Date: Apr 03 2025
Sherwood, OR
Bid Date: Mar 20 2025
Sherwood, OR
Bid Date: Mar 20 2025
Sherwood, OR
Bid Date: Jan 16 2025
Sherwood, OR
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
