Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 12, 2025 at 7:00 PM
Updated December 13, 2025
Site work and paving for a bridge / tunnel in Corvallis, Oregon. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Region 2 OR99W: Marys River Br - Kiger Island Rd (Corvallis) Pacific Highway West Steve Schultz, ($ 2,000,000 - $ 5,000,000) Req. approx. 705 ft2 temp sign; 4 ea PCMS; 400 hr flag; 4 ea flag sta light; 5,000 ea temp flex pvmt marker; 72,000 ft temp stripe; 3,000 ft PCD; 48 ea temp curb ramp; 2,500 ft2 temp walk; 153 ft sed fence; 129 ea inlet protect; 232 ft sed barr; 32 ton contam soil disp; 5 ea soil test; const surv work; 1,725 ft sawcut; 635 yd3 gen exc; 37 yd3 stone emb; 3,000 ft vid insp; 16 ft pipe; 5 ea manhole; 6 ea conc inlet; 672 yd2 br appr CPPR; 648 ft exp joint; 5 ea br id marker; 5 ft2 conc repair; 584 yd2 br deck CPPR; 12 yd2 cl 2 prep; 6,080 ft2 waterproof membrane; 87,810 yd2 CPPR; 480 ton aggr base; 26 ton tack coat; 17,488 ton ACP (1,036 ton PG64-22); 3 ea core corr; 300 yd2 ACP repair; 1,633 ft conc curb; 8,740 ft2 conc structure; 367 ft2 trunc dome; 100 ft gr rl; 117,000 ft pvmt marking durable; 920 ft2 color lane marking; 120 lb sign supp; 39 ft2 sign; traff signal mod; flash beacon light; irrigaton sys. Class of Work: Asphalt Concrete Paving and Oiling Completion Time: October 31, 2026. This Project Contains Asphalt and Fuel Escalation Clauses. Email the Project Manager Listed at the End of Each Announcement for Project Specific Technical Questions The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 005 - OR99W: Mary's River Br - Kiger Island Rd (Corvallis) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Proposed construction activities in the Project Corridor include the following: x Grind and inlay paving of the median and travel lanes along Highway OR99W. x Excavation below the subgrade for the construction of ADA compliant curb ramps at 8 locations (North end of the Project near MP 84.20, Chapman Place, Lilly Avenue, Mayberry Avenue, Alexander Avenue, Richland Avenue, Rivergreen Avenue, and McKenzie Avenue) x Construction of new sidewalk at the north end of the Project (near MP 84.20). x Excavation to a maximum of 5 feet below the ground surface for storm sewer modifications at 5 locations (Chapman Place, Lilly Avenue, Mayberry Avenue, Alexander Avenue, and McKenzie Avenue). x Installation of rectangular rapid flashing beacons (RRFBs) at 4 locations (Chapman Place, Lilly Avenue, Mayberry Avenue, and Richland Avenue). x Construction of pedestrian push signals at Alexander Avenue. x Construction of new handrail or guardrail at 2 locations at the north end of the Project (near MP 84.20). x Asphalt-concrete inlay and bridge joint installations at 4 bridges (#07019, #16875, #07019, and #02701A), and installation of a waterproof membrane at bridge #02701A. x Temporary and permanent easements on the west and east side of the highway for the construction of the curb ramps. MBE (3.8%), WBE (6.9%)
Bid Results
Bridges / Tunnels
$3,038,035.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
February 9, 2026
OR-99W, Corvallis, OR
Related To This Project
Corvallis, OR
--
Corvallis, OR
Bid Date: Sep 17 2025
Corvallis, OR
Bid Date: Oct 09 2025
Corvallis, OR
Bid Date: Nov 20 2025
Corvallis, OR
--
Corvallis, OR
Bid Date: Nov 13 2025
Corvallis, OR
Bid Date: Nov 05 2025
Corvallis, OR
Bid Date: Nov 07 2025
Corvallis, OR
Bid Date: Sep 16 2025
Corvallis, OR
Bid Date: Apr 18 2019
Corvallis, OR
Bid Date: Aug 13 2025
Corvallis, OR
Bid Date: Aug 05 2025
Corvallis, OR
Bid Date: Jul 22 2025
Corvallis, OR
Bid Date: Jul 18 2025
Corvallis, OR
Bid Date: Oct 17 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
