BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 14, 2026

Site work and paving for a bridge / tunnel in Siletz, Oregon. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Region 2 OR229: Fuller and Ojalla (Siletz River) Bridges Siletz Hwy Steve Schultz, RE OR229: Fuller & Ojalla (Siletz River) Bridges Project on the Siletz Highway (Rt. No. OR229) in Siletz. FAP No. S181(009). ($ 5,000,000 - $ 10,000,000). Req. approx. 400 ft2 temp sign; 4 ea PCMS; 1,000 hr flag; 4 ea flag sta light; 6,000 ft temp stripe; portable traff sig; cons surv work; temp access/contain; br jacking; br rem work; 10 ea reinf bar repair; 362 ft2 conc repair; 320 lb struct steel maint; 12 ea bearing dev; 176 ft exp joint; 310 ft pack rust rem; 60 ea rivet/bolt replace; 6,000 ft pvmt marking paint; 250 lb sign supp; 24 ft2 sign. Completion Time: April 30, 2028. Classes of Work: A) Bridges and Structures or B) Painting. This Project Contains Fuel Escalation Clause. This Project Contains a 5% Indian Employment Preference Goal. A Mandatory Prebid Meeting Will Be Held at 10:30 a.m. On September 15, 2026 at 3700 Sw Philomath Blvd, Corvallis, or in the Marys Peak Conference Room. An Online Virtual Prebid Meeting Option Through Microsoft Teams Will Be Held at the Same Time and Date as the in-person Prebid Meeting. A Link for the Online Virtual Prebid Meeting Through Microsoft Teams Will Be Included With the Prebid Meeting Agenda Posted to Odots Ebids Website Under Bid Reference Documents. Project Manager: Steve Schultz, Email: Corvallisconstruction@odot.oregon.gov The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 001 - OR229: Fuller and Ojalla (Siletz River) Bridges *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$10,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
58
Bidding Soon
1,115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

December 14, 2026

Project location map

OR-229, Siletz, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.