Site work for a civil project in Norfolk, Nebraska. Completed plans call for site work for a water / sewer project.

1. This project consists of: 1. Transfer Pump Replacement including salvage of existing transfer pump, demolition of existing suction and discharge lateral piping, valves, and appurtenances, and installation up upsized 4,400 gpm transfer pump with new suction and discharge lateral piping, valves, and appurtenances. This work includes adjustable frequency drive for pump. 2. Installation and connections required for redundant 24-inch diameter transfer pump discharge pipe and valving from the transfer pumps discharge header to the treated water storage tank(s). 3. Reaction basin to filter connection expansion including installation of 30" above and below grade piping with mechanical insulation, connection to existing 24" basin bypass line, and basin wall pipe penetration. 4. Zone 1 High Service Pump HSP-2 Replacement including salvage of existing high service pump, demolition of existing suction and discharge lateral piping, valves, and appurtenances, and installation up upsized 6,000 gpm high service pump with new suction and discharge lateral piping, valves, and appurtenances. This work includes adjustable frequency drive for pump. (Bid Alternate A). 5. Zone 2 High Service Pump additional pump installation up upsized 2,200 gpm zone 2 high service pump with new suction and discharge lateral piping, valves, and appurtenances connection to existing stubbed out piping. This work includes adjustable frequency drive for pump. (Bid Alternate A). 6. Installation and connections required for redundant 24-inch high service pump discharge pipe and valving from the Zone 1 high service pumps discharge header to the Zone 1 water main's bifurcation into dual 24-inch mains on South 49th Street. This includes installation of 6-foot diameter flow meter manhole and flow meter assembly. (Bid Alternate A). 7. Installation of upsized air handling unit in the existing electrical room. .Questions should be directed via email to Tim Engemoen, Black & Veatch Engineering Manager atEngemoenTW@bv.com. The bid security (i.e. bid bond or certified check) as outlined in Articles Iand III of these specifications shall be submitted in a separate envelope along with the proposal. The bid security shall be clearly marked and accessible without needing to open the envelope containing the proposal. Any proposal that does not have bid security as outlined above will not be accepted and is subject to rejection." Each bid must be accompanied by a bid bond or certified check on a bank whose deposits are insured by the Federal Deposit Insurance Corporation in the amount of 5% of the total bid price and must be payable without condition to the Treasurer, City of Norfolk, Nebraska, as evidence of good faith of the bidder and as agreed liquidated damages in case the bidder whose proposal is accepted by the City of Norfolk fails to enter into contract within ten (10) days from the Notice of the Award or fails to furnish acceptable bond to complete the work and pay for all labor and materials used, said bond to be in the amount of 100% of the total bid price. The City of Norfolk, Nebraska ,reserves the right to waive informalities and to reject any or all bids.

Bid Results

Water / Sewer

$2,278,000.00

Public - City

Site Work

57

31

28

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels, Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Bowls
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Identification for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Circuit Protection Devices, Medium-Voltage Fuses, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment, Liquid Process Equipment, Liquid Aeration Devices
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
29
Bidding Soon
306
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

February 10, 2025

img_map_placeholder

To Be Determined, Norfolk, NE

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

West WTP Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.