BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work and paving for a mixed-use development in Alameda, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removal and replacement of damaged sections of existing concrete sidewalk including root cutting, curb, gutter, and driveway; repairing sections of failed asphalt concrete pavement; and replacement of curb drain outlets, and concrete repair of adjacent sidewalk flags. The work shall include traffic control, saw cutting, excavation, backfilling, compaction; installation of root barriers, patching asphalt conforms adjacent to new gutters, and clearing and grubbing. TAs per PCC section 20170, all bids shall be submitted under seal and accompanied by cash, a bidder's bond executed by an admitted surety insurer, a cashier's check, or certified check payable to the City of Alameda in an amount equal to 10% of the total amount bid (PCC 20171). Upon award of the contract, the successful Bidder shall furnish a bond for faithful performance in the amount of 100% of the total bid. The successful Bidder shall also furnish a bond to secure the payment of all claims for labor and material in the amount of 100% of the total bid. Further, the successful Bidder, and all subcontractors, shall pay for and obtain a City of Alameda Business License The Contractor shall begin Work no later than five working days following the start date specified in the Notice to Proceed, which may be hand delivered or sent by email. The Contractor shall complete all Work on the Project within 60 Continuous Working days after the above start date Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half. The City reserves the right to reject any or all bids; to waive minor defects or technicalities; or to solicit new bids Please direct any Project questions to Cristela Soto, csoto@alamedaca.gov

Award

Sidewalks / Parking Lot

$176,721.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
199
Bidding Soon
3,231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.