Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2024 at 7:00 PM
Updated December 10, 2024
Site work for a water / sewer project in Tyler, Alabama. Conceptual plans call for site work for a water / sewer project.
Request For Proposal confederated Tribes Of The Umatilla Indian Reservation Public Works Department 46411 Timine Way Pendleton, Or 97801 Confederated Tribes Of The Umatilla Indian Reservation (Ctuir) Invites Proposals For Engineering Design Of Ctuir Well Site And Water Metering System Upgrades The Project Purpose And Description Is To Provide Engineering And Design Services For Two Upgrade Projects For The Ctuir Public Works Department. The Project #1 Scope Of Work Includes Engineering Design And Project Management For The Construction Of The Following: . Well 3 Onsite Generator With Automatic Transfer Switch . Wells 1 & 2 Security Fencing: 550' Linear Feet Of 8' Chain Link Fence With Three-strand Barbed Wire . Well 4 Onsite Generator With Automatic Transfer Switch And Security Fencing: 220' Linear Feet Of 8' Chain Link Fence With Three-strand Barbed Wire. . Design Work Will Include Sizing The Onsite Generator And Automatic Transfer Switch At Wells 3 And 4. . Upgrades To Water Fill Station (Well 4) . Chlorine Room Improvements - Addition (Wells 1&2) Venting (Well 6 ) . Hvac Minisplit- 5 Locations (Booster, Wells 1&2, Well 3, Well 4, Well 5) . Roof Repair / Replacement For Well Houses- (Wells 1&2, Well 5) . Painting (Interior / Exterior) - 5 Locations (Booster Station, Well 3, Well 4, Well 5) The Project #2 Scope Of Work Includes Engineering Design Project Management For The Construction Of The Following: . 290 Residential Water Meter Replacements . 62 Non-residential Water Meter Replacements . Installation Of An Advanced Metering Infrastructure (Ami) System. . Outline Compatible Billing Programmatic System For Auto-population Of Data Project Timeline: Project Work Expected To Begin In 2025 With Completion To Be Determined During Contract Negotiations. The Ctuir Reserves The Right To Evaluate All Proposals To Ensure That The Best Interest Of The Ctuir Is Served Thereby. The Owners Rights Are Listed In More Detail In The Full Rfp Document.
Conceptual
Water / Sewer
$400,000.00
Public - Federal
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2025
Multiple Locations, Tyler, AL
Related To This Project
Tyler, AL
Bid Date: Jul 08 2025
Tyler, AL
Bid Date: Aug 27 2025
Tyler, AL
Bid Date: Oct 30 2025
Tyler, AL
Bid Date: Nov 17 2025
Tyler, AL
Bid Date: Nov 04 2024
Tyler, AL
Bid Date: Nov 04 2024
Tyler, AL
Bid Date: Sep 19 2024
Tyler, AL
Bid Date: May 16 2024
Tyler, AL
Bid Date: May 23 2024
Tyler, AL
Bid Date: May 23 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
