Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 8, 2025 at 8:00 PM
Updated April 9, 2025
Site work and outdoor lighting for a playground / park / athletic field in Aztec, New Mexico. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
Hartman Park Football Field Lighting project involves installing four lighting poles with concrete anchor bases, rebar cages, electrical conduit, and wiring, as well as transporting and assembling fixtures per design standards, coordinating with city departments for trenching and electric service connections, and ensuring proper compaction and installation of all components The City of Aztec is requesting bids for Hartman Park Field Lighting. All work shall be performed in accordance with the contract documents and in particular, the design drawings and the technical and administrative specifications for this project. The City reserves the right to select any combination of services bid. The bids received will be considered by the City of Aztec at a regular meeting of the City Commission or at a special meeting of the City Commission as may be required. The bidder agrees the work will be substantially completed within 90 calendar days from the Notice to Proceed, as may be modified by change order, and work will be completed and ready for final payment within 104 calendar days from the date of the Notice to Proceed, as may be modified by change order. Question Deadline 03/12/2025, 3:00 PM MT All questions must be submitted in writing to Vanessa Tanner at vtanner@aztecnm.gov or through online. Response to Written Questions/Amendment 01/14/2025 SUBMISSION OF PROPOSAL 03/17/2025, 3:00 PM Recommendations to City Commission (Tentatively) 03/25/2025 Contract Award 03/27/2025 Protest Deadline 04/11/2025
Award
Playgrounds / Parks / Athletic Fields
$76,231.00
Public - City
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2025
April 30, 2025
To Be Determined, Aztec, NM
Related To This Project
Aztec, NM
Bid Date: Jan 29 2025
Aztec, NM
Bid Date: Feb 04 2025
Aztec, NM
Bid Date: Jan 30 2025
Aztec, NM
Bid Date: Mar 03 2025
Aztec, NM
Bid Date: Mar 11 2025
Aztec, NM
Bid Date: Mar 20 2025
Aztec, NM
Bid Date: Dec 05 2024
Aztec, NM
Bid Date: Nov 25 2024
Aztec, NM
Bid Date: Jan 16 2025
Aztec, NM
Bid Date: Jul 24 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
