BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2025 at 7:00 PM

Updated January 10, 2025

Site work for a power facility in Madison, Wisconsin. Completed plans call for site work for a power facility.

Alliant Energy Center to Ferris Center Fiber Loop DEADLINE FOR QUESTIONS: December 10, 2024 The work under this contract shall consist of constructing a fiber optic connection to the Alliant Energy Center from the Ferris Center including, but not limited to, handholes, conduit, locate wire, fiber optic cable, fiber optic splicing, fiber optic system testing, and all incidental items necessary to complete the work as shown on the plans (Attachment A - Found in the ATTACHMENTS section of this bid posting) and included in the proposal and contract. All work shall be performed in accordance with the contract, plans (attachment A), and the City of Madison Standard Specifications for Public Works Construction.

Award

Solar Power Generation

$300,000.00

Public - County

Site Work

15

5

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
97
Bidding Soon
1,676
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

Project location map

Multiple Locations, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.