Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 27, 2025 at 8:00 PM
Updated April 4, 2025
Site work for a water / sewer project in Fountain, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000370906 Job Location: Fountain, CO Fountain Sanitation District needs to replace an old 8" clay sanitary sewer line in Illinois Ave., Fountain CO from Main Street to the Peaks N Pines Brewery (near railroad) early next summer with a 12" SDR-35 pipe, with additional 8" replacement with 8" SDR-35 in Race Street to catch grade. The District is requesting bids from contractors with experience in this type of work. See the existing sanitary sewer flow chart on the cover of the CD's. Remove and replace approximately 820-feet +/- of 8" dia. Vitrified Clay Pipe (VCP) with an 8" & 12" dia. SDR-35 pipe. An estimated six (6) service lines will have to be reconnected to the proposed pipe. The inverts of two (2) existing manholes will need to be modified to accept a new water-tight seal for the 12" PVC pipe. One (1) new 6' Dia. manhole installed. Also, during construction the contractor will be required to pump raw wastewater from the upstream manhole to the downstream manhole, with a backup pump. Best management practices should be used to keep soil out of the storm drainage inlets. Any damaged asphalt will need to be replaced per City of Fountain requirements. The scope of work described above is intended for general overall project work and is not all inclusive of the work that will be required to complete the project by the contractor. Question Deadline 02/05/2025 at 4:00 PM MT Questions are submitted online No No pre-bid meeting will be required. Bid award recommendation to the District Board: February 13, 2025 Construction Schedule: May 27, 2025 through June 27, 2025, cannot change work schedule, because of the bus routes and summer school. Can't start work early, can't finish late.
Award
Water / Sewer
$423,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2025
May 27, 2025
W Illinois Ave, Fountain, CO
Related To This Project
Fountain, CO
Bid Date: Jan 30 2025
Fountain, CO
Bid Date: Feb 21 2025
Fountain, CO
Bid Date: Feb 24 2025
Fountain, CO
Bid Date: Apr 21 2025
Fountain, CO
Bid Date: Jun 13 2025
Fountain, CO
Bid Date: Sep 22 2025
Fountain, CO
Bid Date: Sep 17 2025
Fountain, CO
Bid Date: Nov 29 2024
Fountain, CO
Bid Date: Nov 29 2024
Fountain, CO
Bid Date: Nov 29 2024
Fountain, CO
Bid Date: Nov 29 2024
Fountain, CO
Bid Date: Sep 03 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed