BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 31, 2025

This is a service / maintenance or supply contract in Fountain, Colorado. Contact the soliciting agency for additional information.

Reference Number 0000374000 Delivery Point: Building 704, Fort Carson, CO Purchase Type: One Time Only- Delivery Date: Before February 13, 2025 The City of Fountain, Colorado, is seeking a contractor to remove TA-50 Lockers and store them in shipping containers at Building 704 Fort Carson, Colorado. The selected contractor will be engaged by the City of Fountain to assist in fulfilling the Intergovernmental Support Agreement with Fort Carson. Details are below. The purpose of this project is to remove and store approximately 200 of the TA-50 military lockers in a 40ft long x 8ft wide x 8.5ft high container (Connex), the contractor needs to plan for efficient space utilization. TA-50 Lockers are approximately 78" H x 42" W x 24" D. Calculate Locker Volume and Container Volume and verify Total Space Needed for 200 Lockers. We calculated that 4 - 40' containers (Connex) are needed for 200 Lockers. You will need to efficiently arrange the lockers to make use of the available space. Consider stacking and organizing them in rows. Lockers can be stacked on top of each other since they are heavy-duty and designed for secure storage. Confirm the Number of Lockers. Clean the container and make sure the floor is suitable for storing heavy items. Provide labor and tools to remove 200 lockers from building 704 and haul the lockers to the storage area. Once all lockers are inside, the contractor shall secure them with any method to prevent shifting during storage. Final Cleaning and Inspection Conduct a thorough cleaning of the entire work area to remove any dust, debris, or excess materials. Perform a final inspection with the end user, COR and PM to ensure all tasks have been completed to a high standard and that the new flooring is properly installed and finished Question Deadline 01/30/2025 at 2:00 PM MT Questions are submitted online No, Please contact Bree Dixon at Bdixon@fountaincolorado.org for further questions.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
54
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

To Be Determined, Fountain, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.