BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work and paving for a mixed-use development in Irvine, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of August 15, 2025, work on this building is anticipated to be complete in the next week, since staff is moving in by August 25, 2025. There were multiple contractors handling various projects for this location: Elegant Construction Oscalibur Plumbing Facility Solutions Group Emcor Mesa Energy California Coast Carpet & Flooring Horizons Construction Unlimited Telecom Atlas Technical Consultants Excel Paving Riteway Roofing Convergint GoForth & Marti ePower Network This project may be subject to the Community Workforce Agreement (CWA) between the City and the Los Angeles/Orange County Building and Construction Trades Council (Trades Council). The CWA establishes labor relations policies and procedures for the Contractor and subcontractors of all tiers - including a local hire goal, payment of employee fringe benefits through a union trust fund, and registering employees through a union hall. A signed Letter of Assent must be submitted with Bid proposal packet. The City of Irvine will utilize a CWA Administrator who will work with the Contractors and the Trades Council to oversee the provisions of the CWA. A copy of the CWA is included in Appendix C. License Requirements Class B Online Q&A Yes Q&A Deadline 01/02/2025 4:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Prior to any work being done on the project, Contractors that are not signatory with one of the unions that are signatory to the CWA shall register each of their own workers (Core Employees) with the appropriate union hall and must provide a listing (Core Employees List, see Appendix C) of their Core Employees to the CWA Administrator. The CWA contains a local hiring goal of 30%, calculated based on total hours worked. The local hire provision requires best efforts to utilize qualified workers first residing in the Local Zip Code List (see Appendix C), then to Veterans residing in Orange County, then to graduates from the Building Trades Multi-Craft Core Curriculum (MC3 Graduates) residing in Orange County, and finally other residents of Orange County. When requesting workers from the union hiring hall, the Contractor shall use the Craft Request Form (see Appendix C). This form must be sent to the union hiring hall 48 hours prior to when the worker is needed. The Contractor must hold a Pre-Job Conference that is to be attended by all subcontractors and those attending will disclose their scope of work and union assignments to the Building Trades. The Contractor must fill out the Pre-Job Conference Form (see Appendix C) and submit to the CWA Administrator a week prior to scheduling the Pre-Job Conference. he work to be performed shall include, but not be limited to: Tenant improvements, including architectural, structural, mechanical, electrical, plumbing and ADA improvements and renovations, and other items not mentioned here, but are required by the Special Provisions. Other Details PREVAILING RATES OF WAGES: Prevailing wage requirements apply to public works projects with a value exceeding $1,000.00. The definition of "public works" is found at Labor Code Section 1720, et seq. should be 80 Working days The CITY is subject to the provisions of law relating to public contracts in the State of California. It is agreed that all provisions of law applicable to public contracts are a part of this Agreement to the same extent as though set forth herein, and will be complied with by CONTRACTOR. CONTRACTOR shall abide by all applicable Sections of the California Labor Codes including Sections 1770 -1781, et seq. In accordance with the provisions of Section 1773 of the California Labor Code, the general prevailing rates of per diem wages and holiday and overtime work in the locality in which the Work is to be performed shall be in accordance with the rates posted on the Department of Industrial Relations website, found at online The CONTRACTOR, and any subcontractor under him, shall pay not less than the specified prevailing rates of wages to all workers employed in the execution of this Agreement.

Under Construction

Roads / Highways

$5,841,979.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
664
Active Projects
300
Bidding Soon
3,686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

April 21, 2025

Project location map

17101 Armstrong Ave, Irvine, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.