BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

**As of February 6, 2025 this project has been awarded but award amount not confirmed. As of January 23, 2025, this project has not yet been awarded. The apparent low bidder is Perry's Beach Service, Inc., but no amount provided. Sarasota County is requesting quotes from bidders to provide an all-inclusive quote that shall include labor, materials, equipment, setup, hauling, and supervision for all costs necessary to till approximately 6,000 +/- linear feet of beach on Siesta Key. Question Deadline 01/13/2025 at 2:00 PM ET If the Contractor Has Questions Regarding the Application of Chapter 119, Florida Statutes, to the Contractor's Duty to Provide Public Records Relating to This Contract, Contact the Custodian of Public Records at: Sarasota County Public Records Office 1660 Ringling Blvd. Sarasota, Fl 34236 Phone: 941-861-5886 Email: Publicrecords@scgov.net The County reserves the right to reject receipt of shipment and cancel this Purchase Order if Vendor is unable to provide delivery as required. Bidders area requested to provide an all-inclusive quote that shall include labor, materials, equipment, setup, hauling, and supervision for all costs necessary to till approximately 6,000 +/- linear feet of beach between Florida Department of Environmental Protection (FDEP) Monument R-71, to Monument R-77 in accordance with the requirements specified in FDEP Joint Coastal Permit Modification No. 0240984-008-JN attached hereto and incorporated herein, and as depicted in the attached aerial photographs and surveys. Tilling shall be performed to a minimum depth of 24 inches, and as outlined in Specific Condition 19.b. of the modified permit. Bidders are advised that the project area experienced a loss (erosion) of sand due to impacts from the 2024 hurricanes. The sand loss may preclude tilling access from approximately 750 feet south of R-74 to R-77. The attached aerial photos depict the beach conditions on October 19, 2024, after the hurricanes. Access to the site will be via Sarasota County's Turtle Beach Park, 8918 Midnight Pass Road, Sarasota, FL 34242 Work must be completed before February 15, 2025 Award will be made to the responsive and responsible bidder providing the lowest total bid price. DO NOT submit a quote of more than $50,000. In the event no responsive and responsible quotes are received under the quote threshold, the County may elect to cancel this Quick Quote and re-solicit using another procurement method.

Award

Water / Sewer

$5,300.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

February 10, 2025

Project location map

Multiple Locations, Sarasota, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.