BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated January 30, 2025

Site work, paving and outdoor lighting for a mixed-use development in Wauwatosa, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

Wisconsin Avenue & 70th Street Improvements Site Address: Wauwatosa, Wisconsin Pre-Qualification: Yes Est. Completion Date: Oct. 24, 2025 CONSTRUCTION PHASING REQUIREMENTS 1) Phase 1 a. The Contractor may fully close Wisconsin Avenue from the west radius of N. 68 th Street to the western project limits. Local access must be provided for residents. b. No work can occur in the intersection of Wisconsin Avenue and N. 68 th Street until June 16, 2025. c. No work can occur on N. 70 th Street south of Wisconsin Avenue as WeEnergies will be performing gas main relocations. 2) Phase 2 a. The Contractor may fully close the Wisconsin Avenue and N. 68 th Street intersection until August 29, 2025, as well as maintain full closure on Wisconsin Avenue to the western project limits. Local access must be provided for residents. b. No work can occur on N. 70 th Street south of Wisconsin Avenue. c. The Contractor must provide a 4-way stop condition at Wisconsin Avenue and N. 70 th Street and allow north/south traffic through the intersection while the N. 68 th Street intersection is fully closed. Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for storm sewer construction, water main construction, sanitary sewer, asphalt repaving and reconstruction including grading, concrete curb and gutter replacement, sidewalk and handicap ramps, asphalt pavement, traffic signals, pavement markings, street lighting, and work incidental thereto. Wisconsin Avenue: From: N. 68th Street To: 200' West of N. 72nd Street N. 70th Street: From: Wisconsin Avenue To: W. Blue Mound Road Should any question arise concerning the true meaning of any part of the contract documents, the bidder may submit to the City Engineer a written request for an interpretation thereof. The interpretation of the question so requested will be made as an addendum and either mailed or delivered to all bidders who receive contract documents. Approximate major project quantities: -1300ft of 10" and 12" sanitary sewer -1500ft of 16" PVC water main -16 residential sanitary and water lateral replacements -600ft of 24", 30", 36" RCP storm sewer -1500ft of 54", 60" RCP storm sewer -2500 Tons of asphalt pavement -18 Handicap ramps -Traffic Signals at N. 68th and N. 70th Streets -City to procure signal monotubes and mast arms separately

Bid Results

Sidewalks / Parking Lot

$4,497,095.00

Public - City

Outdoor Lighting, Paving, Site Work

182

9

49

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
3
Bidding Soon
1,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

February 28, 2025

Project location map

N 70th St & W Wisconsin Ave, Wauwatosa, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.