Published April 4, 2025 at 8:00 PM

Updated April 5, 2025

Renovation of a water / sewer project in Renton, Washington. Completed plans call for the renovation of a water / sewer project.

Provide ventilation improvements to the South Treatment Plant Dewatering Building (DWB) Truck Loading Bay (where biosolids are loaded into hauling trucks) to improve the air quality and meet regulatory requirements. Bid Guaranty: Not less than five percent (5%) of the Total Bid Price. Work site: South Treatment Plant, 1200 Monster Road SW, Renton, WA 98057. Bid open description: Join on your computer or mobile app: Join the meeting now Or call in (audio only) +1 425-653-6586,,997403331# Pre bid meeting description: Join on your computer or mobile app: Join the meeting now Or call in (audio only) +1 425-653-6586,,924619635# Question Deadline 01/24/2025 Requests for clarification shall be made in writing via email to the Contract Specialist and cc the Alternate Contract Specialist at least seven (7) days prior to the bid opening date The work of this Contract includes: Obtain necessary permits from the City of Renton (COR) and construct augercast piles on the east side of the Old Truck Washing Facility (OTFW) to support an elevated, steel-framed platform with aluminum grating. Reroute an existing 8-inch diameter storm drain to avoid the new piling for the elevated platform. The elevated platform is to support an air handling unit (AHU) with a capacity of 12,000 cfm (two fans at 6,000 cfm ea). The elevated platform is to be accessed via a new set of steel-framed stairs from an existing balcony on the DWB. The AHU is to intake and filter outside air and supply unconditioned ventilation air to the Truck Loading Bay located immediately adjacent to the OTWF via ductwork that will pass through the existing common wall to enter the Truck Loading Bay at three locations. Each branch duct requires a new wall penetration. The new duct wall penetrations require the relocation of four existing LED light fixtures. The AHU is to be controlled by two VFDs and a new controller that is to be installed in an existing HVAC Control Panel in the VFD Room in the DWB. The new controller is to be integrated to the existing Dewatering Building HVAC Metasys DDC System. VFD power monitoring status is to be connected via network communication to PLC network cabinet and integrated into Ovation DC. Provide power conduit and wiring from an existing motor control center located in the DWB to the two VFDs located near the elevated platform. Provide control conduit and wiring from the existing HVAC Control Panel located in the VFD Room in the DWB to the new VFDs. Provide required documentation And all other work as defined in the Contract Documents.

Award

Water / Sewer

$1,173,252.00

Public - County

Renovation

54

28

13

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
0
Bidding Soon
1,048
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 6, 2025

Project location map

1200 Monster Rd SW, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.