BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work for a water / sewer project in Goodwater, Alabama. Completed plans call for site work for a water / sewer project.

For furnishing all labor, materials, and equipment and doing the work of constructing, according to Plans, Specifications and Contract Documents on file in the office of the Owner, the improvements hereinafter described The work of constructing the Sewer Replacement CWSRF Project No. CS010623-01, Contract No. 1 GW24 116 will be let under one Contract. The principal items of work are detailed herein below. Principal Work: 1. Install 8" PVC Sewer Pipe, SDR 21 2. Install New Manholes No refunds will be made except to bidding Contractors, who shall be refunded for one bid set. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 180 consecutive calendar days and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. A. Contract work provides for the contractor to construct the Goodwater Sewer Replacement. B. Work to be performed, but not limited to, replacing existing sewers, manhole replacement, manhole repair rehabilitation and manhole installation shall be in accordance with Contract Drawings and Specifications prepared by Utility Engineering Consultants, LLC, 130 Southcrest Drive, Suite 100 Homewood, AL 35209 Phone (205) 951.3838. C. Cleanup, seeding and fertilization of excavation not in pavement shall be incidental to the work. D. Hay bales and protection from the silt runoff are considered incidental to the work and are the responsibility of the contractor to meet all requirements to prevent runoff. E. Replacement of existing 8" PVC Gravity Sewer. Commodities (Supplies) MBE 4% WBE 11% Contractual (Services) MBE 8% WBE 30% Equipment MBE 5% WBE 20% Construction MBE 2.5% WBE 3%

Bid Results

Water / Sewer

$310,725.00

Public - City

Site Work

5

15

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
72
Bidding Soon
701
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

February 14, 2025

Project location map

Multiple Locations, Goodwater, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.