Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 25, 2025 at 8:00 PM
Updated March 26, 2025
Site work for a civil project in Griffin, Georgia. Completed plans call for site work for a water / sewer project.
The City of Griffin (hereafter referred to as Owner or The City) is requesting a Proposal from firms (hereafter Firm or Firms) interested in providing Construction Manager at Risk (CMAR) Services, including preconstruction and construction, for a plant expansion at the Shoal Creek Water Pollution Control Plant (WPCP). The WPCP expansion will upgrade the plant from a 2.25 MGD plant sending effluent to the Blanton Mill Land Application System (LAS) to a 3.0 MGD plant discharging effluent to the nearby Shoal Creek. Additional components of the WPCP will be constructed as budget allows to prepare the plant for an upgrade to 5.0 MGD in the future. The WPCP expansion may include upgrades to influent screens, influent pump station, grit removal, biological treatment process, tertiary disk filters, UV disinfection, cascade aerator, creek discharge, aerobic digesters, biosolids dewatering press, operations building, as well as associated piping, appurtenances, sites work, and demolition. The City will select one (1) Firm with experience delivering wastewater treatment plant construction via the CMAR model to participate in the design process and construct the project. This project may be funded in whole or in part by the Georgia Clean Water State Revolving Fund (CWSRF), or the Water Infrastructure Finance and Innovation Act (WIFIA). All associated federal funding requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM) and may not be debarred from doing business with the federal government. Respondents on this work will be required to comply with all applicable federal regulations. The Engineer is currently 60% complete with the WPCP expansion design. The CMAR will work closely with the Engineer in reviewing the design, establishing pricing, and offering value engineering suggestions as the design process continues. The intent is that project costs will be evaluated
Post-Bid
Water / Sewer
$35,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
March 31, 2025
2940 W Ellis Rd, Griffin, GA
Related To This Project
Griffin, GA
Bid Date: Jan 30 2025
Griffin, GA
Bid Date: Jan 29 2025
Griffin, GA
Bid Date: Feb 25 2025
Griffin, GA
--
Griffin, GA
Bid Date: Mar 03 2025
Griffin, GA
Bid Date: Mar 04 2025
Griffin, GA
Bid Date: Mar 28 2025
Griffin, GA
Bid Date: Mar 25 2025
Griffin, GA
Bid Date: Mar 18 2025
Griffin, GA
Bid Date: Jan 28 2025
Griffin, GA
Bid Date: Dec 10 2024
Griffin, GA
Bid Date: Jul 08 2019
Griffin, GA
Bid Date: Nov 18 2024
Griffin, GA
--
Griffin, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
