BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

Site work and renovation of a water / sewer project in Griffin, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of March 5, 2025 , this project has been awarded to Sol Construction, awarded amount not available.** This project shall include the construction of the TROUBLESOME CREEK WWTP EXPANSION TO 0.55 MGD. The project scope includes furnishing of all materials, equipment, labor and means of construction necessary for the expansion of the Troublesome Creek WWTP to 550,000 gallons per day. Community Services L.L.L.P. owns the plant. Significant components of the wastewater treatment plant's construction include the following: New aerobic digester (digester #3) complete with equipment and controls. Associated civil site, process mechanical, electrical and instrumentation work. Removal and replacement of telescoping valves in digesters #1 and #2. Addition of an outer ring and associated equipment to the Orbal aeration basin. Removal and replacement of one submersible return activated sludge pump. Removal and replacement of reject butterfly valve and actuator. Orbal BNR control panel and new system program. All electrical and instrumentation including SCADA. Commissioning and testing.

Award

Water / Sewer

$500,000.00

Public - City

Renovation, Site Work

54

29

37

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
168
Bidding Soon
2,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

February 28, 2025

Project location map

171 Del Webb Blvd, Griffin, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.