BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2025 at 7:00 PM

Updated February 8, 2025

Renovation of a detention facility in Saint Louis, Michigan. Completed plans call for the renovation of a detention facility.

Location: Emergency Generator Replacement, Central Michigan Correctional Facility; St. Louis, Michigan The Work Emergency Generator Replacement for Central Michigan Correctional Facility, DTMB File No. 472/23474.IND includes, but is not necessarily limited to: Install a new emergency generator, automatic transfer switch, and all other associated equipment for the back-up power system. The generator and ATS is pre-purchased by MDOC. Contractor is responsible for installation per the plans, in addition providing and installing all other new equipment shown. A new aboveground diesel fuel tank has been installed by others, but the contractor will need to connect it to the new generator system. The new generator room is to be converted from a storage room at the maintenance building. The existing generator and all accessories are to be removed once the new generator is operational. Careful consideration is required to reduce power and back-up power downtime due to equipment cut overs. Temporary generators are to be provided by the contractor any time the permanent power and/or back-up power system is not operational. A new day tank must be constructed in a pre-project phase

Bid Results

Jails / Prisons

$361,130.00

Public - State/Provincial

Renovation

10

21

16

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
121
Bidding Soon
1,617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 7, 2025

Project location map

320 Hubbard St, Saint Louis, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.