Published February 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Brockton, Massachusetts. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Warren Avenue Two-Way Conversion Location: Brockton, MA Phased Construction, INSERT D. Roadway widening, pavement reclamation and pavement reconstruction will be completed up to and including the intermediate (binder course) with temporary pavement markings along Warren Avenue between Belmont Street and Spring Street by November 26, Page 2 of 2 2025. Drainage and all conduit installations across and along Warren Avenue will also need to be installed. Additionally, all traffic signal equipment, traffic signal specific signing and SMART sensors at each proposed intersection will be installed and fully operational by November 26, 2025, for testing. Sidewalk reconstruction and installation of street lighting, landscaping (including rain gardens) sidewalks, pedestrian ramps, traffic signs not associated with the traffic signals are allowed to extend to 510 calendar days. Side street work including realignment of Highland Street are allowed to extend to 510 calendar days. Estimated Cost: 10.498M The work of this contract includes but is not limited to of full depth roadway reclamation, full depth pavement construction, pavement milling and overlay, removing and stacking or resetting of existing granite curb, installation of new granite curb, construction of sidewalks and curb ramps as well as a raised cycle track, drainage improvements, construction of driveway aprons, loaming and seeding, installation of structural soil, flexible porous pavement (tree well surfacing), trees and plantings, installation of street lighting, installation of signs and pavement markings, safety signing for construction operations, and installing traffic control signal systems (some of which are owner-procured). including video detection, signal posts, signal heads, mast arm assemblies, cabinet pull boxes and conduit. The work under this contract includes installing foundations, wire and cable, and electrical service connections, and all other equipment, materials and incidental costs necessary to furnish, install and program a complete and functioning traffic control signal system as specified and as shown in the contract documents Question Deadline 01/13/2025 All questions about the meaning or intent of the Contract Documents shall be received in writing by CDM Smith, 3 Davol Square, Building A, Suite A-425, Providence, Rhode Island, Attn: Lisa Sherman, shermanld@cdmsmith.com

Award

Roads / Highways

$9,476,736.00

Public - City

Outdoor Lighting, Paving, Site Work

145

15

6

4

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
307
Bidding Soon
3,908
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

March 24, 2025

Project location map

Warren Ave, Brockton, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.