Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 14, 2025 at 7:00 PM
Updated November 15, 2025
Site work, paving and outdoor lighting for a mixed-use development in Brockton, Massachusetts. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.
Warren Avenue Two-Way Conversion Location: Brockton, MA Phased Construction, INSERT D. Roadway widening, pavement reclamation and pavement reconstruction will be completed up to and including the intermediate (binder course) with temporary pavement markings along Warren Avenue between Belmont Street and Spring Street by November 26, Page 2 of 2 2025. Drainage and all conduit installations across and along Warren Avenue will also need to be installed. Additionally, all traffic signal equipment, traffic signal specific signing and SMART sensors at each proposed intersection will be installed and fully operational by November 26, 2025, for testing. Sidewalk reconstruction and installation of street lighting, landscaping (including rain gardens) sidewalks, pedestrian ramps, traffic signs not associated with the traffic signals are allowed to extend to 510 calendar days. Side street work including realignment of Highland Street are allowed to extend to 510 calendar days. Estimated Cost: 10.498M The work of this contract includes but is not limited to of full depth roadway reclamation, full depth pavement construction, pavement milling and overlay, removing and stacking or resetting of existing granite curb, installation of new granite curb, construction of sidewalks and curb ramps as well as a raised cycle track, drainage improvements, construction of driveway aprons, loaming and seeding, installation of structural soil, flexible porous pavement (tree well surfacing), trees and plantings, installation of street lighting, installation of signs and pavement markings, safety signing for construction operations, and installing traffic control signal systems (some of which are owner-procured). including video detection, signal posts, signal heads, mast arm assemblies, cabinet pull boxes and conduit. The work under this contract includes installing foundations, wire and cable, and electrical service connections, and all other equipment, materials and incidental costs necessary to furnish, install and program a complete and functioning traffic control signal system as specified and as shown in the contract documents Question Deadline 01/13/2025 All questions about the meaning or intent of the Contract Documents shall be received in writing by CDM Smith, 3 Davol Square, Building A, Suite A-425, Providence, Rhode Island, Attn: Lisa Sherman, shermanld@cdmsmith.com
Award
Roads / Highways
$9,476,736.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2025
March 24, 2025
Warren Ave, Brockton, MA
Related To This Project
Brockton, MA
Bid Date: Feb 12 2025
Brockton, MA
Bid Date: Jan 22 2025
Brockton, MA
Bid Date: Feb 07 2025
Brockton, MA
Bid Date: Feb 13 2025
Brockton, MA
Bid Date: Feb 24 2025
Brockton, MA
Bid Date: Mar 05 2025
Brockton, MA
Bid Date: Mar 06 2025
Brockton, MA
Bid Date: Mar 06 2025
Brockton, MA
Bid Date: Jan 23 2025
Water Distribution System Improvements Water Transmission Main Valve Replacement - Phase 2 - 4358561
Brockton, MA
Bid Date: Jun 03 2021
Brockton, MA
Bid Date: Jun 03 2021
Brockton, MA
Bid Date: Jun 20 2019
Brockton, MA
Bid Date: Sep 10 2020
Brockton, MA
Bid Date: Sep 23 2021
Brockton, MA
Bid Date: Jan 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
