Published February 7, 2025 at 7:00 PM
Updated February 8, 2025
Renovation of an educational facility in Brockton, Massachusetts. Completed plans call for the renovation of a educational facility.
Project Bid 2025-01 - Technology Building Switchgear Replacement Project. The project includes all labor, materials, equipment, permits and supervision required for the Technology Building Switchgear Replacement Project. New work shall include, but not be limited to: demolition of existing electrical components, new switchgear, transformers, panelboards, circuit breakers, disconnect switches, conductors and testing of conductors that are to remain, concrete and waterproofing. INTENT OF WORK Except as specified otherwise herein, concrete shall be batched, mixed, placed, tested, and cured in accordance with the American Concrete Institute's "Structural Concrete for Buildings" ACI 301. The Electrical Contractor shall schedule his Work in ample time so that provision for their Work can be made without delaying the progress of the project. It is the intention of the Drawings and specifications to produce concrete which will present an acceptable finished appearance. Imperfections of material or Workmanship shall be corrected as the Engineer directs, at the Electrical Contractor's expense. All the Work that is to be inserted in the forms for attachment of other Work is not described in detail. Sub-Contractor shall carefully examine all drawings and other Sections of these specifications for the extent and detail of all such Work and coordinate this Work with other trades. It will be the Electrical Contractor's responsibility to insure that all concrete surfaces are completely free of any conditions which will adversely affect its finished appearance or the application of a specified finish. Failure to comply with these requirements will require removal of sufficiently large Sections of the Work, as determined by the Engineer, in order to properly integrate the Section to be replaced with the Engineering and structural requirements of the total project. All such removal and replacement shall be made at the expense of the Electrical Contractor at no additional cost to the Owner. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 12/11/2024 at 11:00 AM ET Any questions by prospective Bidders concerning interpretation of the Contract Documents must be submitted in writing to the Awarding Authority.
Award
Educational
$530,580.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2025
January 13, 2025
1 Massasoit Blvd, Brockton, MA
Related To This Project
Brockton, MA
Bid Date: Sep 23 2021
Brockton, MA
Bid Date: Sep 10 2020
Brockton, MA
Bid Date: Jun 20 2019
Water Distribution System Improvements Water Transmission Main Valve Replacement - Phase 2 - 4358561
Brockton, MA
Bid Date: Jun 03 2021
Brockton, MA
Bid Date: Jun 03 2021
Brockton, MA
Bid Date: Jan 23 2025
Brockton, MA
Bid Date: Jan 23 2025
Brockton, MA
Bid Date: Feb 12 2025
Brockton, MA
Bid Date: Feb 07 2025
Brockton, MA
Bid Date: Oct 31 2024
Brockton, MA
Bid Date: Oct 22 2024
Brockton, MA
Bid Date: Oct 30 2024
Brockton, MA
Bid Date: Nov 08 2024
Brockton, MA
Bid Date: Oct 08 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.