Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 22, 2025 at 8:00 PM
Updated April 9, 2025
Site work, paving and outdoor lighting for a mixed-use development in Boynton Beach, Florida. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; bridge / tunnel; and bridge / tunnel.
Counties: Palm Beach Road Name: SR 9 (I-95) Limits: At Sr 804 (Boynton Beach Blvd) Interchange Project(s): 43580415201(*) Federal Aid No: D424041B Total Roadway Length: 2.805 Miles Total Bridge Length: 0.096 Miles Total Proposal Length: 2.805 Miles Contract Days: 1044 Question Deadline 02/19/2025 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 105 Days Please read the full advertisement Description: The Improvements under this Contract consist of, but not limited to, roadway widening, milling, resurfacing, overbuild, curb and gutter, sidewalk, guardrail, barriers, fencing, drainage pipes, drainage structures, ponds, bridge widening (BR #930285 and BR #930289), retaining walls, gravity walls, sheet pile walls (temporary and permanent), signing and pavement markings, overhead sign structures, signalization improvements including new mast arm signals and rectangular rapid flashing beacons, intelligent transportation system improvements including wrong way detection and dynamic message signs, lighting improvements, and tree dispositions along SR 804 (Boynton Beach Boulevard) from Old Boynton Road to east of NW 3rd Street and along the State Road (I-95) ramps at the I-95/Boynton Beach Boulevard interchange for 2.354 miles in the City of Boynton Beach, Palm Beach County For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 FDOT - Call Order: 002 - Intermediate Bridge Construction / Grading / Resurfacing - SR 9
Award
Bridges / Tunnels
$64,295,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2025
April 28, 2025
FL-9, Boynton Beach, FL
Related To This Project
Boynton Beach, FL
Bid Date: Feb 26 2025
Boynton Beach, FL
--
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Mar 03 2025
Boynton Beach, FL
Bid Date: Mar 10 2025
Boynton Beach, FL
Bid Date: Feb 20 2025
Boynton Beach, FL
Bid Date: Mar 11 2025
Boynton Beach, FL
--
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Aug 08 2019
Boynton Beach, FL
Bid Date: Feb 03 2025
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: May 22 2025
Boynton Beach, FL
Bid Date: Jan 03 2025
Boynton Beach, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
