Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2025 at 8:00 PM
Updated June 21, 2025
Site work, paving and outdoor lighting for a mixed-use development in Boynton Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and bridge / tunnel.
Counties: Palm Beach Road Name: SR 7 (US 441) Limits: From N of Glades Rd to N of Bridge Brook Dr Project(s): 44767015201(*) Federal Aid No: 44767015202 Total Roadway Length: 3.420 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 3.420 Miles Contract Days: 391 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Days Proposal Budget Estimate: $10,858,874.00 The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, pedestrian LCD, arrow board, PCMS, signalization, traffic detection, barricade), protections (inlet, floating turbidity), monitor structures (inspection, settlement, vibration), TMS (vehicle sensor, inductive loop, cabinet), clearing/grubbing (standard, selective), concrete (removal, gravity wall, curb, curb and gutter, sidewalk, driveways), asphalt (milling, resurfacing, misc), guardrail (general, special post, transition, end treatment, remove), handrail, pavement markings (detectable, painted, thermoplastic, bike lane, RPM), signing (single-column, multi-column, sign strip, tubular marker, object marker, panel F&I, panel remove, internally-illuminated F&I, internally-illuminated remove), lighting (luminaire, bracket arm, pole complete F&I, pole complete remove), signalization (signal cable F&I, signal cable remove, prestressed pole, aluminum pole pedestal, aluminum pole remove, signal auxiliaries, pedestrian signal and detection, controller, loop detector/loop assembly), conduit, pull/splice box, drainage (inlets, pipe culvert), utilities adjustments (manhole, valve box), electrical (power service F&I, power service remove, load center F&I, load center remove, service wire F&I, service wire remove, service disconnect), irrigation, and sod along State Road 7 (US 441) from north of Glades Road to north of Bridge Brook Drive for 3.420 miles in Palm Beach County Question Deadline 02/19/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 013 - Resurfacing - SR 7 (US 441)
Award
Roads / Highways
$9,521,050.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2025
April 28, 2025
FL-7, Boynton Beach, FL
Related To This Project
Boynton Beach, FL
--
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Mar 03 2025
Boynton Beach, FL
Bid Date: Mar 10 2025
Boynton Beach, FL
Bid Date: Feb 20 2025
Boynton Beach, FL
Bid Date: Mar 11 2025
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Mar 24 2025
Boynton Beach, FL
Bid Date: Feb 26 2025
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Aug 08 2019
Boynton Beach, FL
Bid Date: Feb 03 2025
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: May 22 2025
Boynton Beach, FL
Bid Date: Jan 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
