Site work and paving for a civil project in Soquel, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work includes mobilization/demobilization, excavation, backfilling, paving, shoring, bracing, traffic control, installation of 2,260 LF of 12" C900 PVC, one 2" CAV, one fire hydrant, and CCTV line inspection. Work is located in Soquel, CA Engineer's Estimate: $1,595,367 The Owner will not recognize any claim for additional compensation because of the payment by the contractor of any wage rate in excess of the prevailing wage rates on file as aforesaid. The possibility of a wage increase is one of the elements to be considered by the contractor in determining his/her or its bid and will not, under any circumstances, be considered as the basis of a claim against the Owner on the contract. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the Owner, in an amount not less than ten percent (10%) of the bid. The said check or bidder's bond shall be given as a guarantee that the successful bidder will execute the contract in conformity with the form of agreement contained within the contract documents, and will furnish bonds and insurance policies as specified within ten (10) days after notification of the award of the Contract to the successful bidder. The contract documents that the successful bidder must submit within ten (10) days of notification of award include, but are not limited to, a payment bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 3248, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract, and a maintenance bond in an amount of at least ten (10) percent of the amount payable by terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the Owner The Owner reserves the sole right to reject any or all bids and to waive any informality in a bid. No bidder may withdraw its bid for a period of ninety (90) calendar days after the date set for the opening thereof. The Bidder shall guarantee the total bid price for a period of ninety (90) calendar days from the date of bid opening. The Contractor shall perform at least sixty (60%) percent of the Contract Bid Amount. This portion of work shall encompass the performance of work by the Contractor's forces and equipment, the procurement of materials and equipment by the Contractor and field related general conditions required to support and supervise the construction effort. Doc Notes: Copies of the Contract Documents are now on file and available for public inspection. The Contract Documents are available electronically for download, at no cost, and are available for download at online .It shall be the responsibility of each prospective bidder to download and print all Contract Documents for review and bid submittal, and register as a with the Soquel Creek Water District. Question Deadline 01/30/2025 Requests for an interpretation shall be made in writing and delivered to the individual specified in Section 00010, Notice Inviting Bids, at least five (5) working days before the bids are opened as provided in Section 00010, NOTICE INVITING BIDS

Award

Water / Sewer

$1,748,000.00

Public - County

Paving, Site Work

10

9

18

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
5
Bidding Soon
1,297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 17, 2025

Project location map

Multiple Locations, Soquel, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.