BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated February 1, 2025

Site work and new construction of a civil project in Hillsboro, Missouri. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Statement of Qualifications ("SOQ") from firms interested in providing design-build services for the Project described below. By submitting an SOQ, the Offeror represents that it has carefully read the terms and conditions of this RFQ and all Exhibits, Attachments and Addenda and agrees to be bound by them. This RFQ is not an offer to enter into a contract, but merely a solicitation of persons interested in submitting SOQ to the District for the Project, on the terms and requirements stated in this RFQ. The Jefferson County Public Sewer District (JCPSD) proposes to expand the Yorktown Wastewater Treatment Facility to increase its capacity and improve its operational efficiency. The expansion project will involve the addition of a new reinforced concrete tank to the existing facility and the installation of equipment for a sequencing batch reactor (SBR) process. This upgrade will enhance the facility's ability to treat wastewater and protect the local environment. Scope of Work: The project scope includes the following key components: o Site Preparation: Excavation of the site for the new tank and associated infrastructure. o Concrete Construction: Construction of a new reinforced concrete tank to house the SBR process. o Equipment Installation: Installation of wastewater processing equipment, including the SBR system, pumps, piping, valves, and process controls. o Piping: Installation of piping systems to connect the new tank and equipment to the existing facility. o Electrical Construction: Installation of electrical wiring, conduits, and control panels for the new equipment. o Fencing: Construction of fencing to secure the expanded facility. o Grading: Final grading of the site to ensure proper drainage and landscaping. Project Constraints: o Existing Facility Operation: The existing wastewater treatment facility must remain operational throughout the construction period with minimal disruptions to service. o Environmental Compliance: The project must comply with all applicable environmental regulations and permits. o Budget: The project is subject to a defined budget. District has the right to reject any SOQs not properly delivered. To allow receipt of any addenda or other information regarding this RFQ, each Offeror is solely responsible for ensuring the District's Contact Person as described above has the name and email address of Offeror's designated contact person.

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
1
Bidding Soon
975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

September 30, 2025

Project location map

To Be Determined, Hillsboro, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.