BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Renovation of an educational facility in Auburn Univ, Alabama. Completed plans call for the renovation of a educational facility.

Miller Gorrie Center – Rooms 325 & 327, Thesis Studio Upgrades Prequalified Bidders List: Buch Construction; Carlisle Construction, Whaley Construction. Bonds: A Certified Check or Bid Bond Payable to Auburn University in an Amount Not Less Than Five Percent (5%) Of the Amount of the Bid, but in No Event More Than $10,000.00, Must Accompany the Bidder’s Proposal. Performance and Statutory Labor and Material Payment Bonds Will Be Required at the Signing of the Contract. General Contractor’s State Licensing Requirements:When the Amount Bid for a Contract is $100,000 or More, the Bidder Must Be Licensed by the State Licensing Board for General Contractors and Must Show the Architect Evidence of License Before Bidding or the Bid Will Not Be Received by the Architect or Considered by the Awarding Authority. A Bid Exceeding the Bid Limit Stipulated in the Bidder’s License, or Which is for Work Outside of the Type or Types of Work Stipulated in the Bidder’s License, Will Not Be Considered. In Case of a Joint Venture of Two or More Contractors, the Amount of the Bid Shall Be Within the Maximum Bid Limitation as Set by the State Licensing Board for General Contractors of the Combined Limitations of the Partners to the Joint Venture. Performance Bond Through the Performance Bond, the Surety’s Obligation to the Owner Shall Be to Assure the Prompt And Faithful Performance of the Contract and Contract Change Orders. The Penal Sum Shall Remain Equal to the Contract Sum as the Contract Sum is Adjusted by Contract Change Orders. In Case of Default on the Part of the Contractor, the Surety Shall Take Charge of and Complete the Work in Accordance With the Terms of the Performance Bond. Any Reasonable Expenses Incurred by the Owner as a Result of Default on the Part of the Contractor, Including Architectural, Engineering,Administrative, and Legal Services, Shall Be Recoverable Under the Performance Bond. Payment Bond Through the Payment Bond the Surety’s Obligation to the Owner Shall Be to Guarantee That the Contractor and Its Subcontractors Shall Promptly Make Payment to All Persons Supplying Labor, Materials, or Supplies for, or in, the Prosecution of the Work, Including the Payment of Reasonable Attorneys Fees Incurred by Successful Claimants or Plaintiffs in Civil Actions on the Bond. Any Person or Entity Indicating That They Have a Claim of Nonpayment Under the Bond Shall, Upon Written Request, Be Promptly Furnished a Certified Copy of the Bond and Construction Contract by the Contractor, Architect, Owner, or Alabama Division of Construction Management, Whomever is Recipient of the Request.

Bid Results

Educational

$361,900.00

Public - State/Provincial

Renovation

25

12

8

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
58
Bidding Soon
713
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

March 27, 2025

Project location map

270 W Samford Ave, Auburn Univ, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.