BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work and paving for a mixed-use development in Lander, Wyoming. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Water line work including the installation of 1,205 feet of 8-inch PVC, water service taps and curb stops, new hydrant installation, existing hydrant removal, and one 8-inch HDPE horizontal directional bores (137 feet in length) beneath US-287. Sanitary sewer work including sewer manhole installation, 317 feet of new 8-inch sewer main, removal and replacement of a 6-inch service, and one 8-inch HDPE horizontal directional bore (235 feet in length) beneath US-287. Surfacing work includes asphalt removal and asphalt paving on Macfarlane Drive, and spot replacement of sidewalk and curb and gutters. This project also includes replacement of 297 feet of 18" culvert with catch basins and lining of a drainage swale. Question Deadline 01/23/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing Strike Consulting Group Project Manager: 307-335-8466 and Questions received less than seven days prior to the date for opening of Bids may not be answered. Est. Completion Date: Dec. 19, 2025

Award

Sidewalks / Parking Lot

$1,097,972.00

Public - City

Paving, Site Work

23

14

12

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

McFarlane Dr, Lander, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.