BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work, asbestos abatement and renovation of an educational facility in Lander, Wyoming. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Question Deadline 04/11/2025 Submit written questions to be addressed at Prebid meeting minimum of two business days prior to meeting. The existing building is a single story masonry structure. Half of the building serves as the Administration Building for FCSD #1, and the other half of the building serves as the Pathfinder High School. The FCSD #1 Administration wing was remodeled in 2014. The Plans and Specifications here in refered to as the Contract Documents outline the scope of work for the remodel of the Pathfinder High School. The proposed work includes, but not limited to: Asbestos abatement, new flooring, new casework, new lay in acoustical ceiling grid and tile, new led light fixtures, new plumbing fixtures, new doors set in existing hollow metal frames, a new window looking from the Office to the exterior of the building, (2) new windows in the Counselors Office, new paint through out, a new entrance canopy and conrete entry, and associated Alternates as, and if selected by the Owner. The existing building is a single story masonry structure. Half of the building serves as the Administration Building for FCSD #1, and the other half of the building serves as the Pathfinder High School. The FCSD #1 Administration wing was remodeled in 2014. the remodel of the Pathfinder High School. The proposed work includes, but not limited to: Asbestos abatement, new flooring, new casework, new lay in acoustical ceiling grid and tile, new led light fixtures, new plumbing fixtures, new doors set in existing hollow metal frames, a new window looking from the Office to the exterior of the building, (2) new windows in the Counselors Office, new paint through out, a new entrance canopy and concrete entry, and associated Alternates as, and if selected by the Owner. Est. Completion Date: Dec. 31, 2025

Award

Educational

$1,271,850.00

Public - City

Asbestos Abatement, Renovation, Site Work

25

20

22

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
6
Bidding Soon
108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

June 2, 2025

Project location map

863 Sweetwater St, Lander, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.