Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Site work, asbestos abatement and renovation of an educational facility in Lander, Wyoming. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.
Question Deadline 04/11/2025 Submit written questions to be addressed at Prebid meeting minimum of two business days prior to meeting. The existing building is a single story masonry structure. Half of the building serves as the Administration Building for FCSD #1, and the other half of the building serves as the Pathfinder High School. The FCSD #1 Administration wing was remodeled in 2014. The Plans and Specifications here in refered to as the Contract Documents outline the scope of work for the remodel of the Pathfinder High School. The proposed work includes, but not limited to: Asbestos abatement, new flooring, new casework, new lay in acoustical ceiling grid and tile, new led light fixtures, new plumbing fixtures, new doors set in existing hollow metal frames, a new window looking from the Office to the exterior of the building, (2) new windows in the Counselors Office, new paint through out, a new entrance canopy and conrete entry, and associated Alternates as, and if selected by the Owner. The existing building is a single story masonry structure. Half of the building serves as the Administration Building for FCSD #1, and the other half of the building serves as the Pathfinder High School. The FCSD #1 Administration wing was remodeled in 2014. the remodel of the Pathfinder High School. The proposed work includes, but not limited to: Asbestos abatement, new flooring, new casework, new lay in acoustical ceiling grid and tile, new led light fixtures, new plumbing fixtures, new doors set in existing hollow metal frames, a new window looking from the Office to the exterior of the building, (2) new windows in the Counselors Office, new paint through out, a new entrance canopy and concrete entry, and associated Alternates as, and if selected by the Owner. Est. Completion Date: Dec. 31, 2025
Award
Educational
$1,271,850.00
Public - City
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2025
June 2, 2025
863 Sweetwater St, Lander, WY
Related To This Project
Lander, WY
Bid Date: May 28 2025
Lander, WY
Bid Date: Jun 17 2025
Lander, WY
Bid Date: Sep 03 2025
Lander, WY
Bid Date: Aug 19 2025
Lander, WY
Bid Date: Aug 27 2025
Lander, WY
Bid Date: Jul 20 2021
Lander, WY
Bid Date: Nov 24 2025
Lander, WY
--
Lander, WY
Bid Date: Mar 20 2025
Lander, WY
Bid Date: Mar 28 2025
Lander, WY
Bid Date: Apr 10 2025
Lander, WY
Bid Date: Jan 30 2025
Lander, WY
Bid Date: Dec 09 2024
Lander, WY
Bid Date: Jan 13 2025
Lander, WY
Bid Date: Oct 28 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
