BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated January 31, 2025

Site work and paving for a sidewalk / parking lot in American Fork, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances indicated in the Contract Documents to improve the public way at specific location. Question Deadline 01/16/2025 at 5:00 PM MT Online - Q&A Carefully read this section for all the information about the bidding process and award of this Construction Contract. If you have any questions, please contact Felafoai Fano, Contract Administrator at 801 535-6210 For information about technical requirements, contact Ed McDonald at (801) 535-6358. Intent to Bid Due Date: Jan 22nd 2025, 2:00 PM MST Where the measurement and payment items refers to "all work and materials" shown in standard plans: it is understood that "all work" includes but is not limited to, all work necessary to complete a professional finished productincluding all punch list work, and the removal and disposal of all concrete, asphalt, or organic structures necessary in order to complete installation; and that "all materials" includes but is not limited to, all materials described in the APWA 2017 Plans and Specifications for installation of said product Summary of Work Section - Section 01 11 00. A. The work mostly includes but is not limited to removal and replacement of deteriorated or missing concrete sidewalks in the pedestrian corridor Other items could include, installing ADA compliant access ramps, or upgrading existing non-compliant ramps. Also, deteriorated, or missing curb and gutter, drive approaches, and other concrete or asphalt tieins required to facilitate proper sidewalk installation and / or to repair City tree damage. All work will be per APWA Standard Plans and Specifications. Contractors may be asked to move to many locations throughout Salt Lake City. Work at some location may be far between and minimal in size. B. Through independent measurement and on-site survey procedures, CONTRACTOR verifies that the planned concrete removal will provide proper slopes and grades for the installation of the new sidewalk. C. In cases of very flat terrain the Contractor may be asked to flood all drainage devices (curb, gutter, waterways, etc.) both before concrete removal and after installation for ENGINEER to verify proper drainage will and has been achieved for said devices. No standing water in the flow line of the pedestrian corridor of the final ramp assembly will be accepted. D. Tree removal will be done by a contractor under a separate contract. If unavailable the CONTRACTOR will be asked to remove trees per the applicable line item, Document 00 43 00. Removal may only occur with the City Forester's approval and direction of the RPR.

Award

Sidewalks / Parking Lot

$439,445.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
68
Bidding Soon
1,007
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

February 21, 2025

Project location map

Multiple Locations, American Fork, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.