Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2025 at 7:00 PM
Updated January 30, 2025
Site work and paving for a bridge / tunnel in West Cook, Minnesota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Removal of exisiting bridge l4130, construct bridge 16532 and approaches and grading over spruce creek Construction Location: 3.0 MILES NORTHEAST OF JCT. TH 61 ON CASCADE BEACH ROAD OVER SPRUCE CREEK, 11.5 MILES SOUTHWEST OF GRAND MARAIS, MN. TYPE OF WORK: Bridge Construction Major Items: AGGREGATE BASE (CV) CLASS 5 543 CU YD STRUCTURAL CONCRETE (1G52) 53 CU YD STRUCTURAL CONCRETE (3B52) 58 CU YD REINFORCEMENT BARS 3880 POUND REINFORCEMENT BARS (EPOXY COATED) 22870 POUND BRIDGE SLAB CONCRETE (3YHPC-M) 980 SQ FT STRUCTURAL STEEL (3306) 750 POUND TIMBER RAILING 66 LIN FT TREATED TIMBER 0.938 MBM REMOVE EXISTING BRIDGE 1 LUMP SUM Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. Bids and required contractor forms must be completed in and accompanied by a Bidder's Bond in an amount equal to at least 5% of the total bid. The county reserves the right to reject any or all bids and to waive any irregularities thereof. The county reserves the right to adjust any and all quantities to stay within project funds. Award Date: 04/02/2025 Contract Start Date: 01/06/2025 Construction Start Date: 01/06/2025 Construction End Date: 31/08/2025
Bid Results
Bridges / Tunnels
$809,900.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
June 1, 2025
Cascade Beach Rd, West Cook, MN
Related To This Project
West Cook, MN
Bid Date: May 01 2025
West Cook, MN
Bid Date: Sep 03 2025
West Cook, MN
Bid Date: Oct 28 2025
West Cook, MN
Bid Date: Feb 28 2023
Worthington, MN
Bid Date: Jan 31 2025
Minneapolis, MN
Bid Date: Jan 27 2025
Minneapolis, MN
--
Rochester, MN
Bid Date: Jan 24 2025
Albertville, MN
Bid Date: Feb 06 2025
Willmar, MN
Bid Date: Jan 23 2025
Minneapolis, MN
Bid Date: Feb 04 2025
Cologne, MN
Bid Date: Jan 31 2025
Minneapolis, MN
Bid Date: Jan 22 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
