BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated November 20, 2025

Site work and paving for a mixed-use development in Sussex, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

Location Details Site Address: Sussex, WI - Various Sites City: Sussex County: Waukesha State/Province: WI Est. Completion Date: Sept. 26, 2025 Pre-Qualification: Yes Project Description Project Owner Number: 22464 Project Category Code: Pavement - Marking, Sidewalks/Curbs/Gutters, Concrete Walkway, Concrete Pavement, Sawcutting/Sidewalk/Pavement, Traffic Control, Pavement Resurface and Rehabilitation, Landscaping - Seeding, Erosion Control - Temporary, Paving (Asphalt or Concrete), Manhole Rehabilitation, Parking Lots/Ramps, Drainage, Storm Drain and Paving, Asphalt Overlay, Rehab. and/or Maint., Sewer and Water Construction, Sitework/Excavating and Grading, Curbs, Concrete Pavement Removal Description: The proposed construction consists of the repair and/or replacement of storm structures, and pipes; installation of new curb and gutter and sidewalks; base patching; spot repair and/or replacement of curb and gutter, and sidewalks; spot repair and/or replacement of stamped colored concrete patio and concrete pavement; installation of new concrete pavement; the resurfacing and/or replacement of driveways and parking lots; repair and/or replacement of sanitary structures and pipes; installation of pavement markings and symbols; reinstallation of existing signs; around the Public Safety Building, the Public Works Garage, the Water Pollution Control Facility, and the Armory Park. Major work items and approximate quantities for which bids are requested include: full pavement replacement, asphalt overlay only, storm sewer structures repairs, storm sewer pipe spot repairs, sanitary sewer structure repairs, sanitary sewer pipe main repairs, 1,793 square yards of concrete pavement, 3,342 of base patching, 938 lineal feet of concrete curb and gutter, 13,222 square yards of asphaltic surface milling and resurfacing, and miscellaneous utility repair. Question Deadline Jan 20, 2025 Primary Contact Information Owner Details Owner Name: Village of Sussex Solicitor Details Solicitor Name: The Sigma Group Design Discipline: Project Manager Address: 1300 West Canal Street, Milwaukee, WI - 53233 Phone: 414-643-4172 Contact: Paul Imig Email: pimig@thesigmagroup.com

Award

Sidewalks / Parking Lot

$1,085,085.00

Public - City

Paving, Site Work

33

11

20

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
2
Bidding Soon
1,608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.