BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work and new construction of a playground / park / athletic field in Sussex, Wisconsin. Completed plans call for the construction of a 10,100-square-foot, one-story above grade playground / park / athletic field; and for site work for a playground / park / athletic field.

https://www.gmtoday.com/the_freeman/news/7-8-million-construction-contract-awarded-for-sussex-performance-pavilion/article_f9afc661-9f60-596b-a98a-ad47bfb855e5.html Nicholas & Associates was awarded a $7.8 million contract to build a pavilion, outdoor performance area and maintenance facility at Village Park. Jason Piurkowski, director of construction for Nicholas’ Wisconsin office, will lead the project. Piurkowski also worked on the $20 million Meadowview Elementary School in Oconomowoc. The Ridge at Village Park is a new 10,100-square-foot freestanding pavilion with 14,500 square feet of covered outdoor space and an openair stage area. Built for the Village of Sussex Parks Department and the Sussex Lions Club, it will provide community rooms, a kitchen, public restrooms and storage. Construction is slated to begin in mid-July, after the three-day Sussex Lions Daze festival. The Sussex Parks Maintenance Facility is a new approximately 10,500-square-foot building that will serve as the Parks Department’s new headquarters. It will include break rooms, restrooms, a workshop and vehicle service and maintenance spaces. Construction will begin May 1. "Building civic projects like this is in the Nicholas family DNA with our nearly 50 years of experience in constructing municipal, recreational and other buildings in Illinois and Wisconsin," said Christopher Coleman, president of the Nicholas Family of Companies, which includes Nicholas & Associates. "We also are known for working closely with communities and partners to ensure successful completion of projects. "Another major factor in being awarded this contract was having Jason as our local expert on the ground," Coleman added. "Jason grew up on a farm in Stoddard, near the Wisconsin-Minnesota border and a long way from the action and activity of greater Milwaukee. But the strong work ethic developed during his formative years has served him well in his current role, helping us earn the trust of partners like the Village of Sussex." __________________ The Ridge at Village Park is a new free-standing building for the Village of Sussex. The building will be built within the Sussex Village Park to serve the parks department and Sussex Lions Club. The building will have a community rooms, kitchen, public toilets and storage. In addition, the building is connected to a covered pavilion and performance stage. The building is 10,100SF (approx.) 1 story and a basement. The covered pavilion and performance stage is 14,500SF (approx.) 1 story. Est. Completion Date: June 12, 2026 Question Deadline 02/18/2025 Every request for interpretation shall be made in writing and addressed and forwarded to Scott Lousier by email slousier@kahlerslater.com Pre-Qualification: Yes Project Location: W244N6125 Weaver Drive, Sussex, WI 53089. BIDDING OPTIONS A. Village of Sussex is bidding the construction of two buildings within Village Park. The other project is The Sussex Parks Maintenance Facility. Both projects have similar schedules and are located in the same proximity in the park. Both projects are available on QuestCDN.com. Bidders may choose to bid on one project, both projects separately, or both projects together. Contracts will be awarded on the basis of the lowest qualified bid or combination of bids. 1. Contract Scenario 1: Two Contractors (One Contractor for each building); refer to Document 00 4113 - Bid Form. a. Contractor A (The Sussex Parks Maintenance Facility) + b. Contractor B (The Ridge at Village Park) = Lowest Total Bid 2. Contract Scenario 2: Single Contractor (One Contractor for both buildings); refer to Document 00 4113.13 - Bid Form Combined Bid. a. Contractor C = Lowest Total Bid

Award

Playgrounds / Parks / Athletic Fields

$7,814,400.00

Public - City

New Construction, Site Work

105

28

109

4

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
229
Bidding Soon
3,071
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.