BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Demolition, site work, renovation and addition to a civil project in Sussex, Wisconsin. Completed plans call for the renovation of a water / sewer project; for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Location Details Site Address: N59 W23551 Clover Drive City: Sussex County: Waukesha State/Province: WI Est. Completion Date: Dec. 31, 2025 Pre-Qualification: Yes Project Description Project Category Code: Water/Wastewater Infrastructure Description: : The proposed construction consists of improvements to the Village of Sussex Water Pollution Control Facility, including: o Improvements to the existing Effluent Tertiary Filters including removal and replacement of the filter media, replacement of filter nozzle assemblies, coating of the inner cell tank walls, removal and replacement of backwash waste butterfly valves, replacement of pneumatic valve control airlines, removal and replacement of cell isolation butterfly valves, installation of a grated stainless-steel platform in the filter center column, and other miscellaneous work. o Replacement of the existing Bar Screen including removal and replacement of the bar screen, disconnecting power and control wiring from the existing screen and reconnecting to the new screen, and fabrication and installation of a screenings chute to connect to the new Bar Screen to the existing Screenings Washer Compactor. o An alternate bid to also include replacement of the existing Screenings Washer Compactor with a new piece of equipment is also to be provided. o Improvements to the existing Aeration Basin including replacement of the existing chain driven assemblies and motors with new right-angle gearbox drives and motors, removal of existing soft motor starters, installation of variable frequency motor controllers, integration of SCADA controls, new conduit and wiring, and other miscellaneous work. o Improvements to the existing Backwash Holding Tank including reinforcing steel and concrete repairs, minor demolition, removal and replacement of handrails, coating of the tank concrete walls, and other miscellaneous work. o Preparation and coating of walls, ceilings, floors, piping, and equipment in the Grit Room and Filter Room and other miscellaneous surfaces. o Installation of a bypass pumping connection in the existing buried heavy sludge pipeline from Final Clarifier No. 2 to the Main Building and other miscellaneous site work. o All other civil, mechanical, structural, electrical, and instrumentation and control work necessary for a complete and functioning project as shown or specified. Primary Contact Information Owner Details Owner Name: Sussex WI, Village of Address: N64 W23760 Main Street, Sussex, WI - 53089 Phone: 262-246-5230 Contact: Secret Strobl P.E. Email: sstrobl@sussexwi.gov Solicitor Details Solicitor Name: Trotter and Associates, Inc. Design Discipline: Soliciting agent Address: 700 Grand Avenue, Suite B, Lake Geneva, WI - 53147 Phone: 414-422-5276 Contact: Eric Davenport Email: e.davenport@trotter-inc.com Question Deadline 01/20/2025

Post-Bid

Water / Sewer

$990,000.00

Public - City

Addition, Demolition, Renovation, Site Work

37

26

8

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
209
Bidding Soon
1,980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.