BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 29, 2026

Site work for a water / sewer project in Cle Elum, Washington. Completed plans call for site work for a water / sewer project.

The work to be performed consists of the following 1. Water for Dust Control. 2. Construction Access Road. Temporary Erosion Control. 3. Selective Demolition (As shown in the Price Schedule's). 4. Stone Paths (As shown in the Price Schedule). 5. Clearing and Grubbing for staging areas and slopes to receive riprap (As shown in the Price Schedule's). 6. Tree Removal. 7. Excavation and reshaping hillside. Common Fill. 8. Beach Fill. 9. Toe Armor. 10. Geotextile. 11. Riprap (As shown in the Price Schedule's). 12. Bedding Layer, CMP Culvert culvert installation and site grading (As shown in the Price Schedule's). 13. Wood Fence (Optional Price Schedule A). 14. Seeding and Soil Supplements (As shown in the Price Schedule's). 15. Log Structures (Price Schedule). 16. Removal of the Construction Access Road upon completion (Price Schedule). Shoreline protection construction work at Speelyi Beach within the Cle Elum Reservoir, Washington, requiring completion in accordance with requirements for commencement, prosecution, and completion of work. The project falls within an estimated construction magnitude between $1,000,000 and $5,000,000 and is set aside exclusively for Indian Small Business Economic Enterprises (ISBEE). The contractor will be responsible for performing all work necessary to support shoreline stabilization and protection measures consistent with project specifications and timelines. A defined contractor question and answer period is established, with inquiries required to be submitted by 2:00 PM Mountain Daylight Time on July 8, 2026, and coordination supported through designated contracting personnel. A scheduled site visit provides an opportunity for contractors to review existing conditions and project requirements. The construction cost magnitude for this work is between $1,000,000 and $5,000,000. Establish contractor Question and Answer (Q&A) cut-off date. The final date for contractor Q&A is 2:00 PM Mountain Daylight Time (MDT), on July 8th, 2026. No contractor questions will be accepted after this date and time. Please direct all questions to the Contracting Officer Michael Naseath at michael_naseath@ios.doi.gov and the Contract Specialist Jared Detton at jared_detton@ios.doi.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

6

4

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
94
Bidding Soon
1,248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

August 14, 2026

Project location map

Speelyi Beach, Cle Elum, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.