Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Renovation of an educational facility in Cle Elum, Washington. Completed plans call for the renovation of a educational facility.
**As of December,30,2025 this project has not yet been awarded. A timeline for the award has not yet been established.** As of December 10, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Cle Elum-Roslyn Elementary and Middle School HVAC Upgrades Each Bid Shall Be Accompanied by a Certified Check, Cashier's Check, Bank Draft, or Money Order Payable to the Owner or a Bid Bond With a Corporate Surety Licensed to Do Business in the State of Washington, in an Amount Not Less Than Five (5) Percent of the Amount of the Bid. Cle Elum-Roslyn School District prefers that contractors work with Roger Norman from Northwest Automation for the HVAC controls Subcontractors Are Also Welcome. This Project Aims to Provide a Reliable and Efficient Cooling Solution While Minimizing Disruptions to Existing Building Operations, With the Period of Performance for This Project Scheduled for 6/15/2026-08/28/2026. Cle Elum-roslyn School District Requires That the New Hvac Controls Work With the Existing Finstack Software. The Cle Elum-roslyn Elementary and Middle School Currently is Served by a Hot Hydronic Water (Hhw) System Providing Hot Water to Ducted Fan Coils. Cle Elum-roslyn School District Aims to Introduce Cooling Capabilities While Retrofitting the Existing System Without Modifying the Duct Distribution. Meier Architecture and Engineering Proposes Installing a Variable Refrigerant Flow (Vrf) System to Upgrade the Existing Fan Coil Units. The Vrf System Shall Be Integrated Into the Building Management System. The Contractor Shall Follow the Facility and Local Jurisdiction Standards, in Addition to Ashrae and Smacna Standards, and the Washington State Energy Code. This Project is Subject to the Kittitas County Prevailing Wage Rate Requirements. The Owner Reserves the Right to Reject Any or All Bids or to Waive Informalities in the Bidding.
Post-Bid
Educational
$240,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
June 15, 2026
2692 WA-903, Cle Elum, WA
Related To This Project
Cle Elum, WA
Bid Date: Jun 05 2025
Cle Elum, WA
Bid Date: Oct 19 2021
Cle Elum, WA
Bid Date: Jul 01 2025
Cle Elum, WA
--
Cle Elum, WA
Bid Date: Jul 15 2025
Cle Elum, WA
Bid Date: Sep 18 2025
Cle Elum, WA
Bid Date: Sep 18 2025
Cle Elum, WA
Bid Date: Apr 24 2025
Cle Elum, WA
Bid Date: May 02 2025
Cle Elum, WA
Bid Date: Apr 17 2025
Cle Elum, WA
Bid Date: Apr 03 2025
Cle Elum, WA
--
Cle Elum, WA
Bid Date: Mar 19 2025
Cle Elum, WA
Bid Date: Feb 13 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
