Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Idaho Falls, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Tower Road over Idaho Canal Bridge Re Question Deadline 01/27/2025 at 5:00 PM Bridge removal and replacement CONTRACT TIME AND LIQUIDATED DAMAGES Work will not start earlier than October 27, 2025 or later than November 14, 2025 and must be completed within 80 working days. In-canal work will not start earlier than November 15th and all in-canal work must be completed no later than March 1st. Pay additional costs incurred by project for failure to meet inwater milestones including cost to modify permit, fines charged, and damages to irrigation water users. Once started, work must continuously progress until completion except for paving. If all project structure and roadway work items are complete, and weather does not permit project 405 paving to occur within the specification requirements, time may be suspended by the Engineer until weather allows. Provide a formal request to the Engineer for approval of this time suspension. If granted, contract time will resume no later than April 1, 2026. For additional information contact the Program Administrator: Name: Ken Kanownik Phone: (208) 344-0565 Email: Bridge@LHTAC.org Existing Bridge Key Number 31100 is located in the City of Idaho Falls and carries E 65 th N (Tower Rd) Rd over Idaho Canal. The bridge is owned and maintained by the City of Idaho Falls and is located between N 5th W and 5th E . This proposal is for the contractor to remove the existing two-span concrete bridge and replace it with a single span pre-stressed concrete voided slab bridge with reinforced concrete abutments. The road will be closed during construction and traffic will be detoured. Additional work includes road construction due to grade raise and permitted stream alterations including placing riprap.

Bid Results

Bridges / Tunnels

$1,968,574.00

Public - City

Demolition, New Construction, Paving, Site Work

64

10

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
13
Bidding Soon
186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

October 27, 2025

Project location map

Tower Rd, Idaho Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.