Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Site work for a water / sewer project in Eddyville, Kentucky. Completed plans call for site work for a water / sewer project.

The project consists of the removal and replacement of the Deaerator in the Boiler Plant. The deaerator and associated boilers serve the facility steam distribution system. The deaerator shall be removed, and a new deaerator shall be installed in the same location as the existing. Electrical circuits serving the existing deaerator pumps and equipment shall be utilized to serve the new equipment. To facilitate the deaerator replacement scope, one of the two boilers in the boiler plant shall be removed. Upon installation of the new deaerator, the existing boiler shall be reinstalled. A temporary boiler trailer shall be provided to serve the facility while the deaerator is not operational during construction. All work will be performed outside the facility perimeter security fence. All work will be within the security supervised boundary area that surrounds the perimeter security fence. Estimated Length of Project: 180 (Substantial Completion) + 30 (Final Completion) Estimate: $616,000.00 Bids will be received from Prime Contractors on a Lump Sum Bid Basis for the total project. All phases of work shall be bid to and through the Prime Contracting Firms. Bids shall be submitted in the manner herein described and on the official bid document form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business by the Kentucky Secretary of State and the Kentucky Department of Insurance within the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. NO QUESTIONS WILL BE ANSWERED AT THE SITE VISIT. ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT.

Award

Water / Sewer

$882,800.00

Public - State/Provincial

Site Work

6

12

2

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
72
Bidding Soon
1,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 7, 2025

Project location map

266 Water St, Eddyville, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.