BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2025 at 8:00 PM

Updated March 30, 2025

Site work and paving for a mixed-use development in Saginaw, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

0.50 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, water main, signing and pavement markings on Hess Avenue from Jefferson Avenue to Sheridan Avenue in the city of Saginaw, Saginaw County. This is a Local Agency project. 6% Dbe Participation Required Net classification required for this project is 2847 Ea or 2847 K or Comb/Jt. 2847 Cb, J The Contractor shall start work within ten (10) days after receiving Notice of Award of contract and/or before the date designated as the starting date in the Detailed Progress Schedule as agreed upon with the Engineer. Changeable message boards shall be in place by March 28, 2025. All contract work for tree removal must be complete no later than the interim completion date of March 31, 2025. No other work shall start before April 14, 2025. The entire project must be open to traffic on or before August 29, 2025. The project completion date for this project is on or before October 3, 2025; this date is to accommodate an establishment period for turf establishment. All contract work except turf establishment must be completed in its entirety by August 29, 2025. Work is prohibited on City of Saginaw holidays dates outlined below: Memorial Day - Monday, May 26, 2025 (No work from Friday, May 23, 2025 at 3 p.m. to Tuesday, May 27, 2025 at 7 a.m.) Independence Day - Friday, July 4, 2025 (No work from Thursday, July 3, 2025 at 3 p.m. to Monday, July 7, 2025 at 7 a.m.) Labor Day - Monday, September 1, 2025 (No work from Friday, August 29, 2025 at 3 p.m. to Tuesday, September 2, 2025 at 7 a.m.) No unnecessary stoppages in work will be allowed once work has begun at the site. In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea, J and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STUL 73000 216278A 25A0176 Completion Date: 10/3/2025 Question Deadline 01/31/2025 Online - Q&A Telephone inquiries will not be answered MIDOT - 2502 019 - Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter, Sidewalk and Ramps, Water Main, Signing and Pavement Markings on Hess Avenue

Award

Roads / Highways

$3,198,715.00

Public - State/Provincial

Paving, Site Work

49

5

3

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
138
Bidding Soon
1,599
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

March 31, 2025

Project location map

Hess Ave, Saginaw, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.