BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2025 at 7:00 PM

Updated November 12, 2025

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The roadway rebuilding project proposes to implement modern transportation features so people can move from one place to another quickly and safely. Proposed improvements will include: Reduced number of travel lanes from 4-lanes to 2-lanes between S. 33rd Street and S. 1st Street Addition of raised protected bike track Maintain MCTS transit operations and improve bus stop features Addition of pedestrian roadway crossing safety features like curb extensions, raised crosswalks, flashing beacons, and high visibility crosswalk markings Replacing all pedestrian curb ramps with improved features Improving street lighting, and updating traffic signals Replacing all roadside pavement, curb, and driveway approaches, as well as replacing storm sewers and sidewalks at select locations Construction for the project will take place over three years in three separate segments: 2026 - 39th to 27th Street 2027 - 11th to 1st Street 2028 - 27th to 11th Street As of January 17, 2025, this project is expected to begin in mid-2026.

Design

Roads / Highways

$39,600,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
221
Bidding Soon
3,411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

W National Ave, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.