Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 7, 2025 at 7:00 PM
Updated February 8, 2025
Renovation of a municipal facility in Bloomington, Illinois. Completed plans call for the renovation of a municipal facility.
Law and Justice Center Replacement Uninterrupted Power Supply System The County of McLean, a body corporate and politic, will accept sealed bids from qualified vendors to perform a replacement of an existing U.P.S. system at the Mclean County Law and Justice Center located at 104 West Front Street, Bloomington, IL. RFP Process Questions Mr. Anthony Grant, McLean County Assistant Administrator Telephone: (309) 888-5110 e-mail: Anthony.Grant@mcleancountyil.gov Content and Technical Specifications Mr. Scott Fogler, McLean County Facilities Department Project Manager Telephone: (309) 641-3125 e-mail: Scott.Fogler@mcleancountyil.gov The project consists ofthe replacement ofthe existing UPS that serves the data room of the Law and Justice Center. Provide new UPS installed, complete, tested, and ready for operation. Perform the following work: Disconnect existing UPS in penthouse mechanical room, remove from site, and dispose of batteries. Install new 35 kVA, 208V. 3-phase UPS, batteries, maintenance bypass switch and related components in same location. Reconnect new UPS to existing feeder. Connect UPS output to existing feeder serving data room panel. Install remote alarm/monitoring panel in existing data room. Install emergency power offswitch in penthouse where directed by Owner. Coordinate power outage with Owner. Shutdown and change over to new UPS will need to be performed after normal business hours, or on a weekend. Submit product data to Owner for review and approval prior to beginning ofwork. All work shall conform to the attached specifications. All work shall conform to the National Electrical Code. Contractor shall include all costs for fees, permits and inspections. Electrical contractor will provide a one (1) year warranty on all materials and workmanship from date ofsubstantial completion. Extended material warranties will be required per the technical specification sections. Project closeout shall include creation of operation and maintenance manuals, equipment acceptance testing and owner training. All other specifications called out on the engineering documents attached to this RFP. Installation is to be conducted in way to minimize power down time. Question Deadline 01/29/2025 at 4:00 PM CT Questions will be entertained after this presubmission conference . If any answer is given at the pre-submission conference or during the question time period that materially affects this R.F.P., the information will be incorporated into an addendum and provided to all potential submitters ofrecord. Oral comments do not form a part ofthis R.F.P.
Post-Bid
Municipal
$800,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
March 10, 2025
104 W Front St, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Jan 28 2025
Bloomington, IL
Bid Date: Feb 05 2025
Bloomington, IL
Bid Date: Jan 28 2025
Bloomington, IL
Bid Date: Jan 23 2025
Bloomington, IL
Bid Date: Feb 05 2025
Bloomington, IL
Bid Date: Feb 07 2025
Bloomington, IL
Bid Date: Jan 22 2025
Bloomington, IL
Bid Date: Feb 12 2025
Bloomington, IL
Bid Date: Jan 09 2025
Bloomington, IL
Bid Date: Jan 08 2025
Bloomington, IL
Bid Date: Jan 08 2025
Bloomington, IL
Bid Date: Jan 08 2025
Bloomington, IL
Bid Date: Jan 08 2025
Bloomington, IL
Bid Date: Jan 22 2025
Bloomington, IL
Bid Date: Jan 09 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
