EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Lafayette, Indiana. Completed plans call for the renovation of a educational facility.

Wyandotte ES, Wainwright MS and Woodland ES Intercom Replacement & Improvements Work will be executed under a single Prime Contract, executed on a lump sum basis. Prime Contract will include: 1. Intercom Replacement for Wyandotte Elementary School and Wainwright Middle School. 2. Call Station Improvements at Woodland Elementary School Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instruction to Bidders. The successful Bidder(s) will be required to furnish Performance and Payment bonds in the amount of one hundred ten percent (110%) of their contract amount prior to execution of Contracts. The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive irregularities in bidding. All Bids may be held for a period not to exceed sixty (60) days before awarding contracts. WORK BY THE OWNER A. The Owner shall complete general repairs and maintenance throughout the school district throughout the construction period. It is not anticipated that any of this Work by the Owner shall impact any of the contract(s). 1.06 ACCESS TO SITE A. General: The following information applies to all contracts and Work locations. B. Use of Site: Limit use of the Work site to areas immediately adjacent to the work. Do not disturb portions of Work site beyond areas as required for execution of the Work. 1. Driveways, Walkways and Entrances: Keep driveways, sidewalks, and entrances serving premises clear and available to the Owner, the Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. NO deliveries may occur within 30 minutes of school arrival or dismissal. c. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

Post-Bid

Educational

$300,000.00

Public - County

Renovation

5

9

5

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
69
Bidding Soon
735
All Active Projects
376
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

March 4, 2025

img_map_placeholder

Multiple Locations, Lafayette, IN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Wyandotte ES, Wainwright MS and Woodland ES Intercom Replacement & Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.