BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Site work and outdoor lighting for a transportation facility in Honolulu, Hawaii. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

Goals for minority participation for each trade: 70.4% Goals for female participation in each trade: 6.9% Question Deadline 04/29/2026 at 2:00 PM HT All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO. The estimated cost of construction is $48,000,000.00. The scope of work consists of replacing the existing high pressure sodium high mast lights that illuminate the passenger terminal apron, cargo apron, various parking lots, and access and service roads at Kahului Airport and the passenger terminal apron, cargo apron, parking lot, and access road at Lanai Airport. The implementation of full cut-off light fixtures will minimize the impact on seabirds and ensure compliance with the Maui County Habitat Conservation Plan and with HRS Section 201-8.5 Night Sky Protection Strategy. Apron Light Replacement at Kahului Airport, Kahului, Maui, Hawaii, and Lanai Airport, Lanai City, Lanai, Hawaii, State Project No. As1037-12r, The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public. All Request for Information (RFI) questions and Substitution Requests shall be submitted in PRO no later than March 6, 2026, at 2:00 p.m., HST. RFI questions received after the stated dline shall not be addressed. Substitution Requests received after the stated deadline shall not considered. Verbal RFI(s) shall not receive a response. All responses to RFI questions shall be wided for clarification and information only and issued by formal addendum. Any amendments ne solicitation shall be made by formal addendum and posted in HIePRO. If there is a conflict between the solicitation and information stated in the pre-bid conference, the meeting minutes, and/or the responses to RFI questions, the solicitation shall govern and control, unless as amended by formal addendum. The estimated cost of construction is $48,000,000.00. To be eligible for award, bidders shall possess a valid State of Hawaii General Engineering "A" license or a specialty "C-13" Electrical Contractor license prior to the award of contract.

GC Bidding

Transportation Terminals

$48,000,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

107

13

32

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
54
Bidding Soon
347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

November 1, 2026

Project location map

Multiple Locations, Honolulu, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.