BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and new construction of a mixed-use development in Marion, Iowa. Completed plans call for the construction of a swimming pool; for site work for a swimming pool; and playground / park / athletic field.

Work will include the construction of an Aquatic Center and associated onsite improvements, adjacent onsite recreational fields, and the redevelopment of the former Willowood Park. Public infrastructure, such as surrounding roadway and utility improvements are not included in this scope of work. Pre-construction assistance to begin after successful contract execution with CMaR. This project will be subject to a public referendum on November 4, 2025. Pending the approval of the referendum, the first phase of construction is anticipated to commence during spring of 2026 and tentative substantial completion is fall 2028. 1. Aquatic Center, multiple swimming pool basins, a lazy river, water slides, a variety of features/amenities, and support bathhouse and buildings 2. Additional recreational fields 3. Roadway and Utility Improvements (not included in CMaR scope of work) 4. Redevelopment of the current swimming pool site location of Willowood Park. Possible options include a farmer's market with a pavilion, or an expanded park play area with water recreation splash pad. At the proposal stage, qualified respondentswill be asked to submit their proposed feesforthe project. The City of Marion is soliciting Statements Of Qualifications ("SOQ") for Construction Manager at Risk (CMaR) services to provide construction services for its project described in this RFQ (the "Project"). The Marion Aquatic Center Project will be constructed at the southeast corner of S 31st Street and Munier Road and the decommissioning of the Willowood Pool along 35th Street in Marion, Iowa, 52302. This request invites qualified firms to submit an SOQ for accomplishment of the items of work described below under the Project Description and Scope of Work. SOQs shall be prepared and submitted in accordance with the requirements described in this RFQ. The City reserves the right to waive any deficiencies in any RFQ responses and to decide which firms are qualified to submit a proposal in the best interest of the City. Award: Tentatively by March 20th at City Council

Post-Bid

Swimming Pools

$5,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
95
Bidding Soon
1,121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

October 21, 2025

Project location map

1855 35th St, Marion, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.