BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 26, 2025

Site work and new construction of a power facility in Marshall, Minnesota. Completed plans call for the construction of a power facility; and for site work for a power facility.

The proposed construction is described in general as follows: The general nature of the work on which bids will be received consists of the construction of a new generating plant building, installation of four (4) new diesel-fired generating units and auxiliary equipment, along with the connection to the power plant switchgear. The above work shall be in accordance with the specifications and proposed form of contract now on file in the office of Marshall Municipal Utilities, Marshall, Minnesota, by this reference made a part hereof, as though fully set out and incorporated herein. The Contractor and all subcontractors shall submit to the Owner a signed statement verifying compliance with each of the criteria described in the State of Minnesota "Responsible Contractor" law as codified in Minnesota Statute section 16C.285. Question Deadline 02/04/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing The Project has been designed by DGR Engineering. Pre-Bid - N/A All bids shall be made on proposal forms furnished by the Engineer and shall be accompanied by bid security in the form of a certified check or Bid Bond, made payable to Marshall Municipal Utilities, in the amount of ten (10) percent of the bid, which security becomes the property of Marshall Municipal Utilities in the event the successful bidder fails to enter into a contract and post satisfactory Performance and Payment Bonds. Payment to the Contractor will be made on the basis of ninety-five (95) percent upon certification of work completed; five (5) percent within thirty-one (31) days after final completion and acceptance, and delivery of final documentation. The construction shall be performed upon a Notice to Proceed issuance. Substantial Completion of the project shall be no later than November 15, 2026. See the "Construction Schedule" of the Technical Specifications for more details on construction timing requirements. Marshall Municipal Utilities reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after the date bids are received and no bid may be withdrawn during this period. Marshall Municipal Utilities also reserves the right to waive irregularities, reject any or all bids, and enter into such contract as it shall be deemed to be in the best interest of the Utility.

Bid Results

Power Plant

$8,182,418.00

Public - City

New Construction, Site Work

129

36

51

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
34
Bidding Soon
382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

Project location map

To Be Determined, Marshall, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.