BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

South hill street, south Minnesota street, charles avenue reconstruction project this project consists of: Reconstruction of the sidewalk, roadways and utility replacement on alley, charles Avenue, south hill street, south minnesota st. All public utilities will be replaced, Including watermain, sanitary sewer, and storm sewer. Other items of work included in This project are pavement removal, aggregate base, bituminous surfacing, sidewalks, Curb and gutter, concrete alley reconstruction and other minor work. Estimated Quantities of major work items for the project are as follows: item quantity unit item Quantity unit common excavation (p) 2,040 cy 8" pvc watermain 713 lf Aggregate base, (cv) class v (p) 2,165 cy 4" concrete walk 11,518 sf type sp 9.5 Wearing course mix (3,c) 1,165 ton 6" concrete walk 2,181 sf 8" pvc pipe Sewer 406 lf concrete curb & gutter design b418 2,171 lf 1" water sevice Complete 25 each concrete curb & gutter design r418 2,104 lf 6" pvc Watermain 732 lf 6" concrete parking lot pavement 1,100 sy. All bidders are required to become acquainted with the extent of the work and the conditions under which the work will be performed. All bids shall be made electronically via BidVAULT and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. The City Council reserves the right to reject any or all bids or any part of any bid, to waive minor defects, technicalities, or any informalities in the bidding or to advertise for new proposals, and to accept that bid deemed to be in the City's best interest. No bidder may withdraw his bid for at least 30 days after the scheduled closing time for the receipt of bids.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

Project location map

Multiple Locations, Marshall, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.