Published February 28, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Corvallis, Oregon. Completed plans call for the renovation of a educational facility.

Burt Hall CRAC System Replacement CM/GC Oregon State University ("OSU" and/or "Owner") is conducting a competitive ONE OR TWOSTEP Request for Proposals (RFP) process to retain One (1) firm to provide General Contracting Services for a CRAC System Replacement at Burt Hall (the "Project"). Budget. $2,000,000 Summary of Work. Burt 3 Rooms 0155 and 0153 are cooled by 4 CRAC units the current units are (2) 15 ton DX and (2) 20 ton DX. These units are past their life expectancy and have had several failures. Currently temporary cooling units are in place to temper the heat load in the space. The current serve heat load has been reduced to maintain base operations of the cooling system. The proposed CRAC units be sized equally at (4) 30 ton units. These units will be relocated to the roof to accommodate the larger equipment. Other rooftop work included removal of the abandoned rooftop cooling tower. Two smaller heat pumps will also be replaced with similar units ( HP-1, HP-2) The 4 new CRAC (interior & exterior) units have been procured by Oregon State University and are currently being store at the Coast Range Building at 4575 SW Research Way, Corvallis, Oregon 97333. OSU has also pre-purchased the 800amp panel that too is being stored with the CRAC units. The ATS equipment is currently under submittal review and will be delivered to the Coast Range Building, anticipated to arrive mid-February 2025. The selected General Contractor will need to include moving all owner purchased equipment, CRAC Units, Panel and ATS from the Coast Range Building to Burt Hall for installation. The new CRAC units are Dual Cool Units with DX cooling capabilities and Chilled water Cooling capabilities. This project will be connecting these units to the North DUP chilled water loop as Alternate #1. New chilled water pumps and VFD will be installed. Server racks will be relocated by OSU outside of the project scope. The contractor will provide server aisle doors, curtains and above rack curtain enclosures. Additional infill of cold aisle may be needed if racks are missing. Building controls will be included as part of the scope for this work for the areas identified. CONTRACT ADMINISTRATOR: Thomas James Construction Contracts Administration Oregon State University 644 SW 13th Street Corvallis, OR 97333 Email: constructioncontracts@oregonstate.edu Question Deadline 01/24/2025 at 5:00 PM PT All questions shall be submitted via e-mail to constructioncontracts@oregonstate.edu by the Question Deadline in order to be addressed. The email subject line should contain the Solicitation Number/Name and Firm Name. Final Addendum Issuance (if necessary) by 1/28/2025 Estimated notification of finalists (If Applicable) 2/18/2025 Presentations/Interviews (If applicable) Week of 2/24/2025 Notice of Intent to Award By 2/28/2025 Estimated Contract execution By 3/20/2025 Estimated Notice to Proceed By 3/20/2025 Acceptance or Rejection of Solicitation Responses by OSU. 7.5.1 The procedures for Contract awards shall be in compliance with the provisions of OSU standards and policies adopted by OSU. 7.5.2 OSU reserves the right to reject any or all Proposals and to waive minor informalities in compliance with the provisions of OSU standards and policies adopted by OSU.

Award

Educational

$2,000,000.00

Public - State/Provincial

Renovation

33

15

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Abbreviations and Acronyms, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Barriers and Enclosures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Membrane Roofing, Fluid-Applied Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Equipment Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
41
Bidding Soon
598
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

March 20, 2025

img_map_placeholder

2651 NW Orchard Ave, Corvallis, OR


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP Construction Manager - Burt Hall CRAC System Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.