Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work and paving for a civil project in Dauphin, Manitoba. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Reference Number 0000285219 Question Acceptance Deadline 2025/01/17 12:00:00 PM CST All enquiries regarding the Work may be made to: Jeff Slobodzian Senior Highway Project Technologist 257 Industrial Road, Dauphin MB 204-648-4974 Jeff.Slobodzian@gov.mb.ca SECTION I PTH 5 (C09002) Construction of a bituminous pavement and granular base course shoulders on Provincial Trunk Highway 5, from Provincial Trunk Highway 20 to Provincial Trunk Highway 10, for a total construction distance of 19.7km in the Rural Municipality of Dauphin and Rural Municipality Lakeshore. SECTION II Bridge Structure No. 2593 (C09168) Removal of Bridge Structure No. 2953 and open cut culvert installations including frost taper construction and bituminous paving on Provincial Trunk Highway 5, approximately 0.8km East of Provincial Trunk Highway 10, in the Rural Municipality of Dauphin. SECTION III Bridge Structure 2879 Removal and replacement of existing asphalt surface on Bridge Structure No. 2879 on Provincial Trunk Highway 5, approximately 2.3km East of Provincial Trunk Highway 20, in the Rural Municipality of Lakeshore. Daily Liquidated Damages after this specified Completion Date will be charged to the Contractor at the rate of THREE THOUSAND ($3,000.00) Dollars per calendar day until the Work is completed. In addition to the daily Liquidated Damages, a lump sum Liquidated Damage of ONE HUNDRED THOUSAND ($100,000.00) Dollars will be charged to the Contractor for unplanned carryover if the Work is not completed by OCTOBER 15, 2024. In addition, the Lump Sum Liquidated Damages will be charged to the Contractor on a recurrent annual basis until Substantial Completion. The assessment of the lump sum Liquidated Damage for the Completion of the Work will decrease in direct proportion to the value of the Work completed relative to the actual final total value of all the Work if the Work is incomplete. The Work shall be defined as all work, not including contingency. The Work must be completed by no later than OCTOBER 1, 2025. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$8,885,330.00

Public - State/Provincial

Paving, Site Work

5

6

8

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
25
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 3, 2025

Project location map

Multiple Locations, Dauphin, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.