EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Williamsport, Pennsylvania. Completed plans call for site work for a water / sewer project.

Millers Run Stream Bank Restoration Project For the Millers Run Stream Bank Restoration Project located in Loyalsock Township, Lycoming County. LT Questions Due Date: Feb 4th 2025, 4:00 PM EST Online Portal The project shall include, but is not limited to, 650 feet of stream bank restoration consisting of an R-7 Rock Key and geo-reinforced earth with live plantings. The scope also includes installing erosion and sediment control measures, traffic control and all necessary incidental work, appurtenances and site restoration for said construction as set forth in the Project Manual A certified check or bank draft payable to the order of Loyalsock Township, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. Construction Performance and Payment Bonds are required in the amount of one-hundred (100) percent of the Contract as awarded. Bidders are hereby notified that state Prevailing Wage Rates must be paid in accordance with Pennsylvania (PA) law. Each Bidder (and Bidder's subcontractor[s]) must ensure that employees, and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Bids may be held by the LT for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. They also reserve the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts. LT is an Equal Opportunity Employer.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

4

7

19

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
71
Bidding Soon
825
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

img_map_placeholder

To Be Determined, Williamsport, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Millers Run Stream Bank Restoration Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.