Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work, paving and renovation of a mixed-use development in Telford, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for the renovation of a sidewalk / parking lot.

*As of February 26, 2025 this project has been awarded to multiple contractors Clipper Pipe & Service Inc. for $304,600.00, DESCCO Design & Construction, Inc. for $5,866,652.70 and Eastern Environmental Contractors, Inc. for $1,288,200.00 with overall total amount of $7,459,452.70 PFAS Water Treatment Project Well Nos 1, 3, 5, 6 and 7 The project consists of the furnishing, construction and installation of new Granular Activated Carbon (GAC) Adsorption/Filtration Systems at five (5) locations; Construction of Filter Buildings, Building Additions, Chlorination Equipment, Underground and Above ground Piping, Valves and Fittings, Demolition of Existing Facility Infrastructure, Various Site Improvements including Upgrade of Existing Driveway, Erosion and Sedimentation Controls and Site Restoration, including Grading, Seeding, Concrete Work, Curbing and Paving. Electrical Construction includes upgrades to existing electrical service supply and installation of circuit breakers, transfer switches, transformers, motor starters, conduit and wiring and lighting, instrumentation and SCADA system modifications and associated work. Mechanical (HVAC) Construction includes supply and installation of ceiling fans, louvers, heaters, dehumidifiers, duct work and accessories. The project is federally funded through the Pennsylvania Infrastructure Investment Authority (PENNVEST) from the Drinking Water State Revolving Fund (DWSRF), Bipartisan Infrastructure Law (BIL) and other state and federal sources, requiring Contract compliance with the Grant. All bids must include lump sum or unit prices to be considered for award by the Authority at their option after review of the bid amounts. Question Deadline 02/12/2025 at 4:00 PM ET Online Portal Bids must be accompanied by a certified check, bank draft or bid bond issued by a surety company licensed to conduct business in the Commonwealth of Pennsylvania, in the amount of at least ten percent (10%) of the total bid price made payable to the Authority. On projects receiving federal funds, the Davis Bacon Act applies. Workers employed under this Contract must be paid Davis-Bacon Act wage rates. Under the Davis-Bacon and Related Acts (DBRA), to which all Contracts awarded under EPA assistance agreements (Grants) in excess of $100,000 that involve the employment of mechanics or laborers require Contractors and subcontractors to comply with the overtime provisions of the Contract Wage Hours and Safety Standards Act (CWHSSA) at 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations in 29 CFR Part 5 and 2 CFR 200 Appendix III(E). The successful bidder shall pay no less than the wage rates determined for the project area as set forth in the Contract Documents. The Contractor shall comply with State and Federal requirements attached to this project manual which provisions cover: Federal Labor Requirements and Standards, Affirmative Action Program requirements and goals; Federal Payroll Requirements, DBE/MBE/WBE document requirements, and Build American, Buy American requirements. The successful bidder for each Contract will be required to furnish separate bonds with corporate surety issued by companies authorized to do business in the Commonwealth of Pennsylvania on the prescribed forms dated the date of the Contract, or separate Federal or Commonwealth chartered lending institution irrevocable letters of credit in a form accepted and approved by the Authority, or separate restrictive or escrow accounts with such lending institutions pursuant to an escrow agreement accepted and approved by the Authority, each equal to one hundred percent (100%) of the contract amount, to secure (a) the faithful performance and maintenance of the Contract; and (b) the prompt payment of materials and labor Bid result - GENERAL CONSTRUCTION - Descco Design & Construction Inc. - $5,866,653 MECHANICAL (HVAC) CONSTRUCTION - Clipper Pipe & Service Inc - $304,600 Electrical Subcontractor Eastern Environmental Contractors, Inc. $1,288,200

Award

Water / Sewer

$7,459,453.00

Public - City

Paving, Renovation, Site Work

60

30

33

7

Subscribe For Documents

115 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
940
Active Projects
508
Bidding Soon
6,424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

April 21, 2025

Project location map

Multiple Locations, Telford, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.